Title Page
-
Conducted on
-
Prepared by
-
Location
Pre-work questions.
-
What is your Work Order number?
-
What review are you undertaking?
-
Have you got two hard copies of the drawings and the drawing register for the site?
Drawing tasks.
-
(INSTRUMENT ONLY) Has the earth-tagging been updated and red-lined on the relevant drawings?
-
If the answer is no, please give a brief description as to why.
-
Have you reviewed and red-lined the drawings?
-
If the answer is no, please give a brief description as to why.
-
Have you reviewed and updated the drawing title?
-
If the answer is no, please give a brief description as to why.
-
Have you reviewed and updated the drawing register electronically?
-
If the answer is no, please give a brief description as to why.
Hazardous Area Drawing.
-
Is there a SR25 drawing on site?
-
If the answer is n/a, please give a brief description as to why.
-
Take a photo of the drawing number and revision number on the SR25.
Post-work questions.
-
Have you removed all old drawings from site?
-
If the answer is no, please give a brief description as to why.
-
Have you left one set of the hard copies that has been red-lined on site?
-
If the answer is no, please give a brief description as to why.
-
How long did it take to review and update the drawings on site?
-
How are you sending the drawings back?
-
Have you electronically sent the updated drawing register back?
-
If the answer is no, please give a brief description as to why.