Title Page

  • Project Name

  • Project No.

  • Conducted on

  • Prepared by

  • Location

Area Inspection & Handover sheet - (Paint)

  • Main contractor

  • Area of inspection & handover

  • Specific Location Details
  • Zone

  • Grid Ref

  • Level

  • Column

  • Beam

  • Rafter

  • Secondary

  • Bolts

  • Check list
  • Areas prepped and rust stains removed

  • Hold point 1 - environmental checks in place before coating

  • Primer touch up to damaged steel

  • Hold point 2 - primer to cure and DFTs to be checked

  • Elcometer devices used
  • Which Device Used?

  • Serial Number

  • Wall Steel Comments

  • Addition information attached

  • Signed Wall Steel Print Name

  • Signed Wall Steel

  • Date

  • Main contractor comments

  • Addition information attached

  • Handover accepted subject to comments above

  • Signed Main Contractor Print Name

  • Signed Main Contractor

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.