Title Page
-
Conducted on
-
Prepared by
-
Location
-
Date:
-
Project
-
Client:
-
Project Number:
-
Contractor:
-
Time:
-
Site Conditions:
Safety:
-
Is all machinery fitted with flashing lights?
-
Are TTM’s in place?
-
Is signage in place and clear?
-
Are there any underground or overhead services?
-
Are stockpiles safe and stable?
Environmental:
-
Is an Environment Protection Agreement in place and is it being followed?
-
Are sediment controls in place and working?
-
Does sediment pond require pumping?
-
Is a procedure in place for testing and dosing before releasing
-
Is dust suppression sufficient?
-
Have stockpiles been temporarily grassed?
-
Are stockpiles clear of natural drains?
Clearing:
-
Have retained trees been fenced off?
-
Has all debris, trees etc been removed?
-
Has any timber fallen on neighbouring property?
-
Has the cleared material been disposed of in a satisfactory manor?
-
Has topsoil been stripped to bottom of grassroots zone?
General:
-
Are there any soft spots?
-
Are there any rocks protruding from the finished surface level?
-
Has topsoil been stripped to bottom of grassroots?
-
Does topsoil stockpile exceed 2.5m in height?
-
Does batter exceed 2:1?
-
Is blasting required?
-
Has unsuitable material been removed?
-
Has there been an NCR raised?
Compaction:
-
Has density testing been carried out and does it pass?
-
Is moisture content correct at time of compaction?
-
Does compaction comply with standard spec?
Subgrade:
-
Has the floor been cut to designed grade line?
-
Is there any unsuitable material?
-
Has remaining material in floor been ripped?
-
Is subgrade affected by moisture?
-
Is proof rolling required?
-
Has the subgrade been affected by moisture?
Testing:
-
Has correct frequency of testing been adhered to?
-
have test points been taken from correct area?
-
Are test results within tolerances given in standard spec?
-
Are there any non conforming areas?
-
Extra comments: