Title Page
-
PCN #
-
Resource / Equipment :
-
Process Control Document #
-
Conducted on
-
EEHS reviewer:
-
Which type of change applies:
-
If change involves construction, renovation, building demolition, new property, modifications to existing HVAC or pollution control equipment, changes in operation, equipment installations or removals that may require pollution control ( painting- changes to ECA permit operations, changes in plant or process) Magna Environmental Department MUST be notified as soon as possible.
-
Information on change or modification
-
Are contractors working on the project / change / modification? WSIB, COI, Contractor Orientation, Contractor hazard assesment completed? If yes, which contractor?
-
Will approved production limits on ECA permit be affected or require a increase ?
-
Does the process /change include the use of flammables or combustibles?
-
Are there new chemcials being used in the process
-
Has a New Product Submission been completed and product added to SDS database?
-
Are there any new hazards or risks with the chemical involved?
-
Are new spill kits required ? if yes,which type of material
-
Will quantities for chemicals ( resins, adhesive, lubricants, plastic pellets, ect) or metals ( stainless steel, aluminum, coils, wires) increase ? If yes verify substance notification requirements, NPRI, Spill plan
-
Does the process/change use acids , corrosives or alkalies?
-
Is there any Designated Substances used in this process?
-
Has the Designated Substance list been updated ?
-
Is there any potential for a spill from the change or process?
-
Is there a fire risk associated with the change or process?
-
Will change increase lubricant, water or scrap in press pit ?
-
Does change involve coils?
-
Is the crane in the stamping/coil area able to lift and move the coil safely? (Crane max lift weight acceptable)
-
is there room to safely store the coils and can the coils be loaded onto mandrel without issue?
-
Can any of the waste generated be recycled?
-
Are there any hazardous wastes or by-products from this process or change?
-
Which hazardous waste area will the wastes be stored in?
- Toolroom- Flammable /Ignitable waste area
- Oil room- Liquid industrial wastes
-
Waste class :
-
Are new or specific recycling, hazardous waste or additional garbage bins required ? List type /details
-
Would the machine / process increase the energy usage ? Water , Electricity ,Gas
- Increase Hydro / KWH
- Increase Water consumption
- Increase Gas consumption
- Decrease Hydro /KWH usage
- Decrease Water usage
- Decrease Gas usage
- Not relevant to change
-
Does equipment qualify for energy rebates or energy savings ?
-
Is there more energy efficient equipment ,systems or methods available? Detail what energy rating comparisons were made and where they can be found
-
Does this process need to be added to the Environmental Aspects list?
-
Does this process need to be added to the Significant Environmental Aspects list?
-
Is a Controlled Environment needed for this process?
-
Is this a modification to an existing process already documented?
-
Does this process vent or exhaust to the outside?
-
If Yes, Stack or Exhaust number or location:
-
Is an exhaust system or air scrubber required? (Laser , chemicals hazardous/ combustible fumes or dusts created in process, check dust is not accumulating on items )
-
Is any Environmental Legislation affected by this process?
-
Are any permits / certificates or testing required before process begins?
-
Industrial hygiene testing recommended for Air, Noise or Vibration?
-
Internal Noise Measurement db Reading ( if applicable )
-
Does Electrical equipment have the ESA sticker?
-
Has a Pre-Start Safety Review been completed by an engineer and all non-conformances corrected?
-
Has a Ergonomic Design Checklist and ERA been completed by the line engineer ?
-
Has a JSA been completed by Engineering ?
-
Does the JSA align with JES? Risk ratings must match, risk methodologies need to be the same
-
Does all equipment conform to Reg. 851 for Industrial Establishments?
-
Has a lock out / tag out placard been posted? Lock out points identified and labelled ?
-
Have Operator Instruction sheets been completed and posted? (JES )
-
Have equipment specific Pre-Use Inspection sheets been implemented?
-
Are additional emergency response or specific procedures or postings required ( robot placards , press specific entrapment, Injection molding shut down steps, chemical warnings ect)
-
Additional Personal Protective Equipment Recommended
-
Enter requested PPE ( if applicable )
-
Training : EEHS training plan for this change need updating ?
- EEHS training plan needs updating
- Not relevant
- Will be reviewed with HR
-
Can employees safely access the new area or equipment
-
What is required? and or what is the issue that requires investgation?
-
Add signature