Title Page
-
Document No.
-
SENSUS REF:
-
Client / Site Ref:
-
Conducted on
-
Prepared by
-
Location
Section 1 General
1 . GENERAL
-
1.1 Have all electrical been identified for the project?
-
1.2 Have risk assessments been undertaken where required.
-
1.3 Have risk controls been implemented following the hierarchy of controls ( Elimination, Engineering, Isolation, Substitution, Administrative, PPE)
-
1.4 Have workers been consulted on electrical hazards and risk control outcomes
-
1.5 Have other relevant duty holders been consulted on electrical hazards and risk controls?
-
1.6 Is there a policy in place to ensure that electrical work will only be undertaken when de-energised?
-
If No list the controls that will be in place to address electrical risks for persons working on live electrical installations:
- Power isolated to specific circuit/s
- Warning tags installed to live circuits.
- Lock out of electrical service cupboard.
- All duty holders and workers informed of isolation period.
- All power isolated to property while work is being undertaken.
-
1.7 Is there a nominated person to ensure that all inspections are undertaken as required (visual and testing)?
-
1.8 Is all work defined as electrical work undertaken by a qualified person (licensed electrician)?
Section 2 Overhead Electrical Hazards