Title Page
-
Location / Site
-
Prepared by
-
Conducted on
Electrical Works
-
Works being conducted:
-
Leads elevated above ground level on Non conductive support/material
-
Lead stands covered in non conductive material
-
Leads not obstructing access and egress ways.
-
Are lead plugs in good condition.
-
Leads not secured or tied off directly to scaffolding or handrails.
-
Are all connection and plugs clean and fitting correctly.
-
Are handles and guards fitted and in good condition. ie grinders / drills.
-
Are the correct disks for the job being used. ie grinding disk for grinding & cutting disk for cutting.
-
Current quarterly inspection tags fitted to all Electrical equipment..
-
Are electrical hand tools and machines stored correctly when not in use.
-
Temporary power boxes located clear of hazards and obstructions.
-
Are switchboards correctly labelled
-
Are RCD’s tested and operational
-
Further Findings:
Sign
-
Name:
-
Select date
-
Signature: