Title Page
-
Audit Title
-
Time In
-
Time Out
-
Prepared by
-
Location
-
Document No. EMC F10042 Rev 1/2017 DED
Maintenance Log Checklist
-
Instructions:
-------------------------------------
1. Answer "Yes" or "No" for the questions below.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link.
Maintenance Log Checklist
-
Settleometer Reading (Every Visit):
-
Blowers
-
Bar Screen Cleaned? (Every Visit)
-
pH Controller Cleaned & Calibrated? (Every Visit)
-
Caustic Soda Drum Replaced? (As Needed)
-
Diffusers Cleaned ? (As Needed)
-
Clarifier Surface Cleaned? (As Needed)
-
Chlorine Contact Chamber Cleaned? (Every Visit)
-
Sand Filter Backwashed? (Every Visit)
-
Effluent Weir Basin Cleaned? (Every Visit)
-
All 3 Blowers Operational? (Every Visit)
-
Chlorine/Dchlor Tablets Replenished? (As Needed)
Quality Control Test
-
Ammonia Level:
-
Test Strips used or Kit (Choose one from the dropdown list)
-
Aeration Basin pH: (General Rule pH 7.5-8.0)
-
<br><br>Samples Collected?
-
Effluent pH - S.U.
-
Effluent D.O. - mg/l
-
Effluent CI2 - mg/l
-
Flow - MGD
ADDITIONAL NOTES
COMPLETION
-
Signed By