Title Page
-
Audit Title
-
Time In
-
Time Out
-
Prepared by
-
Location
-
Document No. EMC F10055 Rev 7/2017 HCJ
Maintenance Log Checklist
-
Instructions:
-------------------------------------
1. Answer "Yes" or "No" for the questions below.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link.
Maintenance Log Checklist
-
Settleometer Reading (Every Visit):
-
Blowers
-
Waste Tank Level ? (Every Visit)
-
Mixed Liquor Returns To Surge Tank Walking ? (Every Visit)
-
Aeration Tank D.O. ? (As Needed)
-
Clarifier Surface Cleaned & Walls Brushed Down?<br> (As Needed)
-
Effluent Weirs Cleaned ?<br> (As Needed)
-
Both Turbine Blower In Service ?<br>(Every Visit)
-
Sand Filter Backwashed? (Every Visit)
-
Chlorine Tablet Feeder Replenished ?<br>(Every Visit)
-
Chlorine Contact Chamber Cleaned ?<br> (Every Visit)
-
Sludge Wasted ?<br>(As Needed)
-
Effluent Instant Flow & Totalizer Reading MGD ?<br>(Every Visit)
Quality Control Test
-
Ammonia Level:
-
Test Strips used or Kit (Choose one from the dropdown list)
-
Aeration Basin pH: (General Rule pH 7.5-8.0)
-
<br><br>Samples Collected?
-
Effluent pH - S.U.
-
Flow - MGD
ADDITIONAL NOTES
COMPLETION
-
Signed By