Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Name of the building/ structure:
-
Date built:
-
Description:
Dimensions
-
Structure Length:
-
Structure Width:
-
Structure Height:
Materials
-
Walls:
-
Underground utility location confirmation #:
-
Potential hazards ( collapse, structural failure, etc.):
-
Item #s requiring a Job Safety Analysis:
-
Method of demolition:
-
Item #s requiring Professional Engineer input:
Safety Exposures
-
Oxygen Lines
-
Natural gas lines
-
Electrical lines
-
Water lines
-
Other utilities
-
Fire hazards
-
Adjacent walkways
-
Adjacent roadways
-
Adjacent buildings
-
Combustibles
-
Water towers
-
Railroad tracks and crossings
-
Heavy equipment hazards
-
Confined space hazards
-
Smoke stacks<br>
-
Elevators
-
Party walls
-
Basement
-
Open pits or trenches
-
Bulkheads
-
Manholes to preserve
-
SDS (MSDS) provided
-
Fall hazards
-
Lead exposure
-
Chemical exposure
-
Process hazards
-
Live utilities
-
Utilities to disable
-
Lighting
-
Fiber optic cables
-
Trenching/ Excavating
-
Shoring required
-
Pre-existing structural damage
-
Asbestos
-
Environmental issues
-
Other safety issues
-
Item #s requiring a Job Safety Analysis: