Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Describe the current weather conditions at time of inspection?
1. General
-
1.1 Any signs of construction related disturbance outside of construction area(s)?
2. Erosion & Sediment Control
-
2.1 Are erosion controls (where required) correctly installed and maintained?
-
2.2 Are there any excavations that might require dewatering?
3. Water Quality
-
3.1 Any apparent illegal discharges to sewers or storm water? (oils, septic tanks, concrete wash out, etc)
-
3.2 Are spill kits readily available in area's?
4.0 Air Quality
-
4.1 Dust suppression equipment readily available in work area's?
5.0 Waste Management
-
5.1 Are the waste materials separated correctly? (e.g. General waste, paper/cardboard, metals).
6.0 Hazardous Substances & Materials
-
6.1 Are the hazardous cabinets placed away from drains and/or waterways?
-
6.2 Is a spill kit and fire extinguisher close to this location/s?
7.0 Other
-
List any other environmental issues or impacts on the site;
8.0 Action Plan
-
8.1 Are there any actions required as a result of this inspection?
-
8.2 Detail the required Corrective Action/s, assigned responsible person and close out date.
9.0 Sign Off
-
Person completing inspection