Title Page
-
John Pointon & Sons Daily Walk-around and Inspection checklist
-
Date and Time of inspection
Biobed and Humidifier Units
Biobed / Humidifier unit A
-
Water tank full
-
Operation of water pump
-
Water spray visible
-
Drain clear
-
Operation of fan
-
Filter cleaned
-
Water storage tank
-
Bed temperature (degrees Celcius)
-
Ducting temperature (degrees Celcius)
-
Bed pressure ("H2O)
Biobed / Humidifier unit B
-
Water tank full
-
Operation of water pump
-
Water spray visible
-
Drain clear
-
Operation of fan
-
Filter cleaned
-
Water storage tank
-
Bed temperature (degrees Celcius)
-
Ducting temperature (degrees Celcius)
-
Bed pressure ("H2O)
Biobed / Humidifier unit C
-
Water tank full
-
Operation of water pump
-
Water spray visible
-
Drain clear
-
Operation of fan
-
Filter cleaned
-
Water storage tank
-
Bed temperature (degrees Celcius)
-
Ducting temperature (degrees Celcius)
-
Bed pressure ("H2O)
Biobed / Humidifier unit D
-
Water tank full
-
Operation of water pump
-
Water spray visible
-
Drain clear
-
Operation of fan
-
Filter cleaned
-
Water storage tank
-
Bed temperature (degrees Celcius)
-
Ducting temperature (degrees Celcius)
-
Bed pressure ("H2O)
Biobed / Humidifier unit E
-
Water tank full
-
Operation of water pump
-
Water spray visible
-
Drain clear
-
Operation of fan
-
Filter cleaned
-
Water storage tank
-
Bed temperature (degrees Celcius)
-
Ducting temperature (degrees Celcius)
-
Bed pressure ("H2O)
Line 6 Biobed
-
Water tank full
-
Operation of water pump
-
Water spray visible
-
Drain clear
-
Operation of fan
-
Filter cleaned
-
Water storage tank
-
Rotary valve operational
-
Cyclone operational
Audit continued
Other Abatement Equipment
-
Line 4 extraction fan (running)
-
Lorry park sump pump (operational)
Condensors
-
No. 1 (Running)
-
No. 2 (Running)
-
No. 3 (Running)
Emissions
-
Boiler House Stack (Particulate Observed)
-
Boiler House Stack (Smoke Observed)
-
Thermal Oxidiser Stack (Particulate Observed)
-
Thermal Oxidiser Stack (Smoke Observed)
-
Category 1 Plant Ducting Inspection
-
Category 3 Plant Ducting Inspection
Housekeeping
-
Spillage Kits ( sealed / unused)
-
Engineering Store (Gates closed and tidy)
Meter Readings
-
Borehole meter ( Old boiler house)
-
Borehole No.2 Meter
-
Wash down water meter
Weather
-
Pressure (mbar)
-
Temperature
- -10
- -9
- -8
- -7
- -6
- -5
- -4
- -3
- -2
- -1
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
-
Wind Strength (m/sec)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
-
Wind Direction
- North
- North North East
- North East
- East North East
- East
- East South East
- South East
- South South East
- South
- South South West
- South West
- West South West
- West
- West North West
- North West
- North North West
Sign Off
-
Inspection Carried out by :