Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1. Office

  • 1.1. Environmental risk assessment conducted and available?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 1.2. EMP developed and available.

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 1.3. Hazardous substance/ dangerous goods register current?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 1.4. MSDS's available and less than 5 years old?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 1.5. Environmental emergency response plans developed and available?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 1.6. Hours of work identified and communicated?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 1.7. Traffic management plan developed and displayed?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 1.8. Environmental training conducted and records available?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

2. Site boundary and external

  • 2.1. Perimeter silt fencing in place and adequate?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 2.2. Adequate additional site sediment and erosion control measures in place?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 2.3. Drains and pits marked/ identified?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 2.4. Drains and pits protected from potential contaminants and soil/storm water run-off?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 2.5. External public roads and paths free of soil/ mud and debris?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 2.6. Grid/ shakedown/ wheel wash in place?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

3. Storm water control

  • 3.1. Storm water management plan available and implemented?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 3.2. Early connection of gutter and down pipes to drains

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 3.3. Chemical storage areas suitably located?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 3.4. Paved areas/ roads swept regularly?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 3.5. Process water not entering storm water?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 3.6. Provision made for control of fire water?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 3.7. Testing of storm water during rain event?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 3.8. Spill kits present and stocked?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

4. Waste management

  • 4.1. Reuse of existing furniture and fittings

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 4.2. Recycling of demolition material where practicable?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 4.3. Segregated skips/ bins/ stockpiles?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 4.4. Solvents/ caustic waste in suitable containers?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 4.5. Packaging/ cardboard reused where possible?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 4.6. Paint washout facility implemented?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 4.7. Tip/ transfer dockets maintained on site?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 4.8. Recycled material used in new work?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

5. Noise management

  • 5.1. Council permits displayed and adhered to?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 5.2. Neighbours/ tenants notified?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 5.3. Noise monitoring conducted as required?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 5.4. Noise levels considered in selection of plant and equipment?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 5.5. PPE supplied and worn?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 5.6. Complaints register maintained and follow up actions closed out?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

6. Dust control

  • 6.1. Soil stockpiles covered/ treated with dust suppressant?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 6.2. Water spraying roads/ entry/ exits?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 6.3. Bins/ chutes covered?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 6.4. Cutting rooms established?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 6.5. Vacuuming/ wet sweeping?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 6.6. Extraction devices on power tools?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

  • 6.7. PPE supplied and worn?

  • Risk

  • Corrective actions

  • Responsible party

  • Priority

  • Corrected by next inspection?

Other observations

  • Additional observations

  • Additional environmental observation
  • Observation

  • Responsible Party

  • Priority

  • Completed by next inspection?

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.