This report is to be used by the assessor to inspect the site and record any safety, health and environmental hazards. The assessor should also pick an area of further inspection (e.g. SSOW, PUWER, Emergency arrangements etc) to ensure these are compliant with regulations and in- house procedures
-
Overview of current works
-
Have items from previous inspections been closed out?
Hazard spotting
-
Hazard
-
Close out time scale
-
Closed out by (sign and date)
-
Hazard definition
- 1st aid
- displayed information
- project paperwork
- site welfare
- COSHH
- fire precautions
- safety signage
- work @ height
- excavations
- plant & machinery
- lifting equipment
- crane
- edge protection
- temp works
- hot works
- isolations
- portable tools
- hoist
- MEWPS
- hoarding and fencing
- traffic routes
- access and egress
- PPE
- housekeeping
- environmental
- health hazards
- public interface
- site security
-
Root Causality
- Design
- Error enforcing conditions
- Tools and Equipment
- Housekeeping
- Maintenance Management
- Procedures
- Training
- Communication
- Incompatibility of goals
- Organisation
- Defences
- Sub-contractor
Environmental and Sustainability
-
Has the PMP been updated (from tender copy / to reflect site progress)?
-
Have both documents been briefed out to key members of staff (supervisor and above)?
-
Is there any evidence of materials / liquids being deposited outside of site boundary? (e.g. Mud on road etc)<br>
Positive observations
-
Positive observation
-
SSOW Review
-
SSOW reference
Non - Compliance
-
Non - compliance noted
-
Causality
- Information Incomplete
- Information not updated
- Not briefed out
- SSOW not followed
- SSOW not understood
- Procedure not followed
- Procedure not understood
- Procedure Inaccurate
-
Closed out (Sign and Date)
Procedural Compliance
-
Record area of inspection
Non - Compliance
-
Non - compliance noted
-
Causality
- Information Incomplete
- Information not updated
- Not briefed out
- SSOW not followed
- SSOW not understood
- Procedure not followed
- Procedure not understood
- Procedure Inaccurate
-
Closed out (Sign and Date)
SHEQ Bulletins
-
SHEQ bulletins up to date and relevant
Inspection Sign off
-
Add signature
Hazard Rating
-
Please record the hazard rating using the following criteria for each occurrence:
24 hour - score 5
3 day - score 3
7 day - score 1
If items from previous inspection have not been closed out in allocated timescale immediately score additional 10 points
This will give you a total hazard rating for the site.
Next score the positive observations 1 point for each positive observation during the audit
Where site demonstrates the implementation of observation cards add up to 4 points to this total - maximum points only if the cards are being used (more than 1 or 2 completed), the cards are being closed out, the site is displaying sorted=reported poster and details are being entered on EZONE