Title Page

  • Site conducted

  • First Line of Address

  • Conducted on

  • Prepared by

Client and Property details

Property Details

  • Full Address (including Postcode)

  • Property Type

  • Property Detachment

  • Property Age

  • Domestic / Commercial

Scaffolding and Ladder Check - Roofers ONLY

  • Has Scaffolding been Erected?

  • Picture of Scaffold

  • Is scaffolding be erected safely?

  • Is there a scaffold tag on the job?

  • Image of Scaffold Tag

  • Is Ladder in Good Condition?

  • Image of Ladder Attached to Scaffold

Risk Assessment

  • Does the customer understand the works being carried out?

  • Stop work and advise customer reason of visit

  • Is there a safe place to park the vehicle?

  • Are all household items removed creating a safe working area?

  • Are all tools suitable for use ?

  • Is the weather suitable for install?

  • Any other Restictions or Concerns?

  • Local hospital been identified prior to work commencing?

  • Please State local Hospital...

Asbestos

  • Is there an asbestos report present for the job?

  • Have you read through the asbestos report before beginning the job?

  • Is there any known Asbestos containing materials present in the working area?

  • Where is the Asbestos containing material present?

  • Picture of Asbestos containing material

  • Are you going to be disturbing Asbestos Containing Material?

  • How will the Asbestos Containing Material be Affected and What Safety precautions are going to be used to limit distruption?

  • Artex Encountered?

  • Would the task involve affecting the Artex?

  • Is the Artex listed on the survey as containing Asbestos Containing Materials?

  • Screenshot evidence of this

  • Do you have the relevant safety equipment to work on Asbestos containing material?

  • Installer Signature - Please sign when all relevant questions have been filled and you are happy with the precautions in place to complete potential works on Asbestos Containing Materials if present

Pre Works - Before Installation

  • Front Elevation

  • Any damage to roof ?

  • Photo of roof where installation is to be carried out

  • Which elevations is the work to be carried out on ?

Mid Install Works - During Installation

  • Roof fixings

  • Rails Installed

  • Installation of panels half way through install

  • DC Cable ends terminated - Photo Required

Post Works - After Installation

  • Was the Job able to be installed safely?

  • Was Bird Mesh Installed ?

  • Bird Mesh

  • Photo of irradiance meter on panel showing reading

  • Pictures of Completed Job - Externally (Panels etc.)

  • Picture of Completed job from Ground Level

  • Was there any improvements we could've made on the job?

  • How many panels were installed ?

  • Could more panels have been installed ?

  • Confirmation of Completion by Roofer

Customer Satisfaction

  • Confirmation of Completion by the occupier - this confirms that the customer is happy with the install

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.