Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Customer Name
Pre Set up
-
Have you put down the protective sheets before starting work?
Warranty Required Photos
-
Installed plywood to cover the gap left by the drip rail (Photo/s required)
-
Base Rail Level? (Photo/s required)
-
Base Rail Connecter used? (Photo/s required)
-
Any rotten plywood that needed to be replaced with new plywood? (Photos required if plywood replaced)
-
Base Rail installed above Bay Windows? (Photos Required)
-
Have you put L Shape boards around the windows and doors? (Take photos of all windows for evidence)
-
Have you put APU Bead around all windows?
-
Has Rockwool been used around the boiler flue with 1 metal washer in each rockwool? (Photo required if applicable)
-
Have the window sills been fitted?
-
Have you installed Apex Ventilation? (Photos required of both Apexs / Gabel Ends)
-
Has the background ventilation been cut through the walls? (Photo required of each background vent)
- Yes
- No - Window Trickle Vents Fitted/Already Installed
-
Have background vents been installed in habitable rooms? (Photos required of them going through the wall - use the labels to show which vent is which)
Other photos and checklist
-
Does the park home have enough jacks in situ supporting the chassis<br>(8 for single, 16 for double)
-
Do all lights have sleeving? (Photo required for evidence)
-
Do all lights have the grey wago box fitted? (Photos required)
-
Does the door bell cable have the grey wago box fitted (Photos required)
Park Home Boarding Final Stage
-
Take photos of all elevations of the Park Home now boarded
-
Any other photos that need to be be taken that isn't on this survey?