Information
-
Document No.
-
Exhibition Fire Egress Inspection
-
Prepared by
-
Conducted on
-
Staff Members Conducting Inspection?
Audit - Hall 1
Fire Egress Inspection - Exhibition Hall 1 (including Exit Light and Door Return)
-
Doors Exit to Street
-
H1-SW-D1
-
H1-SW-D2
-
H1-SW-D2 (x 2) - Darling Drive
-
H1-W-D5
-
H1-W-D5 - Darling Drive
-
Break Glass Alarms
-
H1-E-D1
-
H1-E-D3
-
H1-E-D4
-
H1-E-D7
-
H1-E-D8
-
H1-E-D11
-
H1-SE-D1
-
H1-SE-D2
-
H1-SW-D1
-
H1-SW-D2
-
H1-W-D1
-
H1-W-D3
-
H1-W-D4
-
H1-W-D5
-
Terrace East
-
Terrace North
-
Sth Door 1 - Dock 1
-
South Door 2 - Dock 1
-
H1-SE-D1 <br>
-
H1-SE-D2
-
H1-SE-D2 (x 2)
Hall 2
Fire Egress Inspection - Exhibition Hall 2 (including Exit Light and Door Return)
-
Doors - Exit to Darling Drive
-
H2-W-D1 - South West
-
H2-W-D1
-
H2-W-D10 - North East
-
H2-W-D10
-
Loading Dock to POD 2
-
Mezzanine to POD 2
-
Break Glass Alarms
-
H2-E-D1
-
H2-E-D3
-
H2-E-D4
-
H2-E-D5
-
H2-E-D8
-
H2-E-D12
-
H2-W-D2
-
H2-W-D8
-
H2-W-D9
-
H2-W-D10
-
M2E0-D1
-
M2EO-D2
-
M2EO-D5
-
M2EI-D1
-
M2EI-D3
-
Dock 2 West
Hall 3
Fire Egress Inspection - Exhibition Hall 3 (including Exit Light and Door Return)
-
Doors - Exit to Darling Drive
-
H3-W-D1
-
H3-W-D1 - South West
-
H3-W-D10 - Darling Drive
-
H3-W-D10 - North East
-
Loading Dock to POD 3
-
Mezzanine to POD 3
-
Break Glass Alarms
-
H3-E-D1
-
H3-E-D4
-
H3-E-D5
-
H3-E-D8
-
H3-W-D9
-
H3-W-D10
-
M3-E0-D1
-
M3-EO-D2
-
M3-EO-D5
-
M3-EI-D1
-
M3-EI-D3
-
Dock 3 West
Hall 4
Fire Egress Inspection - Exhibition Hall 4 (including Exit Light and Door Return)
-
H4-W-D1 - South West
-
H4-W-D10
-
H4-W-D10 - North East
-
Loading Dock to POD 4
-
Mezzanine to POD 4
-
Break Glass Alarms
-
H4-E-D1
-
H4-E-D4
-
H4-E-D5
-
H4-E-D8
-
H4-E-D9
-
H4-E-D12
-
H4-W-D2
-
H4-W-D8
-
H4-W-D9
-
H4-W-D10
-
M4-EO-D1
-
M4-EO-D2
-
M4-EO-D5
-
M4-EI-D1
-
M4-EI-D3
-
Dock 4 West
-
H4-W-D1
-
Doors - Exit to Darling Drive
Hall 5
Fire Egress Inspection - Exhibition Hall 5 (including Exit Light and Door Return)
-
Doors - Exit to Darling Drive
-
Lift 9 Lobby to Terrace - Mezzanine
-
H5-W-D1
-
H5-W-D1 - South West
-
H5-NE-D2- CPE3 (Exit to Carpark - North East)
-
Loading Dock to POD 5
-
Mezzanine to POD 5
-
Break Glass Alarms
-
H5-E-D1
-
H5-E-D4
-
H5-E-D5
-
H5-E-D8
-
H5-E-D9
-
H5-E-D12
-
H5-W-D2
-
H5-W-D7
-
H5-W-D8
-
H5-W-D14
-
M5-EO-D1
-
M5-EO-D2
-
M5-EO-D5
-
M5-EI-D1
-
M5-EI-D3
-
H5-NE-D2 -CPE3 (North East) <br>
-
Dock 5 West
-
Loading Dock Pedestrian Gate
Recommendations and Sign Off
-
Recommendations (if any):
-
During the inspection, were there any areas that require immediate attention? (Please take an image)
-
Signature of Auditor:
-
Copies of this inspection need to be sent to: (please check boxes of recipients that require attention as a result of this inspection)
-
BUILDING SERVICES - Chris Killeen (ckilleen@scec.com.au)
-
LANCORP SYSTEMS - Ashley and Bonita George (lc.service@lancorp.com.au; ashley.george@lancorp.com.au; bonita.george@lancorp.com.au)
-
WASTE and ENVIRONMENTAL SERVICES - William Konya (wkonya@scec.com.au)
-
RISK and SAFETY MANAGER - Llyris Young - (lyoung@scec.com.au)
-
SECURITY ADMINISTRATION - Esther Yung (eyung@scec.com.au)