Title Page
-
Job Number
-
Job Name
-
Conducted on
-
Project Manager
-
Temperature
-
Location In Building
-
Confirm adequate stocking of material location
-
Notes
-
Add media
-
Confirm Sheathing installed and screwed per plans and specs
-
Notes
-
Add media
-
Confirm E.J. sheathing cut at double studs (if applicable)
-
Notes
-
Add media
-
Confirm sheathing vertical joints staggered 2-stud bays minimum
-
Notes
-
Add media
-
Confirm sheathing joints staggered over door, grille openings, etc.
-
Notes
-
Add media
-
Confirm door frames plumb and true after sheathing is hung
-
Notes
-
Add media
-
Confirm backing screwed off through sheathing (if applicable)
-
Notes
-
Add media
-
Confirm cement board screwed-off with proper screws and spacing per product data, plans and specs
-
Notes
-
Add media
-
Confirm cement board is not bowed at backing locations, MEP openings and cutouts
-
Notes
-
Add media
-
Confirm screw type and coating per system requirements (i.e.: EIFS requirements, etc)
-
Notes
-
Add media
-
Confirm framing is signed-off and approved
-
Notes
-
Add media
-
Sign Off
-
Forman
-
Q.C. Sign Off
-
Comments