Title Page
-
I.D.I. Job Number
-
Job Site Name
-
Conducted on
-
I.D.I. QAQC Inspector
-
Job Site Area of QAQC Inspection
-
Confirm for updated drawings, RFI's, plans & specs
-
Confirm framing is signed-off and approved
-
Confirm adequate location of material stocking
-
Confirm adequate covering of sheathing with a breathable tarp or Tyvek
-
Confirm screw type & coating per system requirements
-
Confirm if joints and screws need to be treated
-
Confirm sheathing/cement board is installed with proper gap requirements and screwed per shop drawings, plans and specs
-
Confirm E.J. sheathing cut at double studs, if applicable.
-
Confirm sheathing vertical joints are staggered 2-stud bays minimum
-
Confirm sheathing joints are staggered over door/window openings (no joint going straight up from jamb)
-
Confirm door frames are plumb after sheathing is hung
-
Confirm sheathing is screwed thru backing or bracing within stud cavity, if applicable
-
Confirm cleanup of our cartons and scrap materials
-
Inspect and walk the site with G.C. Superintendent
-
Comments
-
Sign Off
-
I.D.I. QAQC Inspector