Title Page

  • I.D.I. Job Number

  • Job Site Name

  • Conducted on

  • I.D.I. QAQC Inspector

  • Job Site Area of QAQC Inspection

  • Confirm for updated drawings, RFI's, plans & specs

  • Confirm framing is signed-off and approved

  • Confirm adequate location of material stocking

  • Confirm adequate covering of sheathing with a breathable tarp or Tyvek

  • Confirm screw type & coating per system requirements

  • Confirm if joints and screws need to be treated

  • Confirm sheathing/cement board is installed with proper gap requirements and screwed per shop drawings, plans and specs

  • Confirm E.J. sheathing cut at double studs, if applicable.

  • Confirm sheathing vertical joints are staggered 2-stud bays minimum

  • Confirm sheathing joints are staggered over door/window openings (no joint going straight up from jamb)

  • Confirm door frames are plumb after sheathing is hung

  • Confirm sheathing is screwed thru backing or bracing within stud cavity, if applicable

  • Confirm cleanup of our cartons and scrap materials

  • Inspect and walk the site with G.C. Superintendent

  • Comments

  • Sign Off

  • I.D.I. QAQC Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.