Title Page
-
I.D.I. Job Number
-
Job Site Name
-
Conducted on
-
I.D.I. QAQC Inspector
-
Job Site Area of QAQC Inspection
-
Confirm for updated drawings, RFI's, plans & specs
-
Confirm all tiles are seating properly in grid
-
Confirm there are no gaps in border cuts
-
Confirm all cuts behind columns
-
Confirm for any insulation fibers on the tile faces, if any was used
-
Confirm no missing or damaged tiles. If evident, state which trade
-
Were all MEP's done before ceiling tile installation
-
Confirm cleanup of our cartons and scrap materials
-
Inspect and walk the site with the G.C. Superintendent
-
Comments
-
Sign Off
-
I.D.I. QAQC Inspector