Title Page

  • I.D.I. Job Number

  • Job Site Name

  • Conducted on

  • I.D.I. QAQC Inspector

  • Job Site Area of QAQC Inspection

  • Confirm for updated drawings, RFI's, plans & specs

  • Confirm correct gauge of studs (Factors include impact drywall, tile backer board, etc.)

  • Confirm door and window frames, studs and headers are plumb, square, and level

  • Confirm top track is plumb

  • Confirm all bottom track is shot down per plans and specs

  • Confirm stud spacing, bridging, blocking, clips and flat strap are installed per plans and specs

  • Confirm wall studs sit tight to web in bottom track and are fastened per plans and specs

  • Confirm non-full height wall kickers are installed per plans and specs

  • Confirm walls are plumb

  • Confirm C.J. are laid out per plans and specs

  • Confirm stud framing (walls, ceilings or soffits) are plumb, square, level, and at the correct height

  • Confirm approved recessed accessories are framed per plans and specs

  • Confirm added framing at beams and bar joists on fire-rated partitions are installed per assembly requirements for blow out

  • Confirm cleanup of our cartons and scrap materials

  • Inspect and walk the site with G.C. Superintendent

  • Comments

  • Sign Off

  • I.D.I. QAQC Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.