Title Page
-
I.D.I. Job Number
-
Job Site Name
-
Conducted on
-
I.D.I. QAQC Inspector
-
Job Site Area of QAQC Inspection
-
Confirm for updated drawings, RFI's, plans & specs
-
Confirm MEP overhead complete & sign off prior to ceiling framing
-
Confirm MEP rough opening layout complete (lights, grilles, diffusers)
-
Confirm MEP access door
-
Confirm fire-stop or sound caulk at head of wall (if required)
-
Confirm fire-taping and sound caulking of wall above ceiling (if required)
-
Confirm studs/drywall grid are installed per plans/specs
-
Confirm backing installed at items hung from ceilings
-
Confirm ceiling & soffit heights per plans/specs
-
Confirm cleanup of our cartons and scrap materials
-
Inspect and walk the site with the G.C. Superintendent
-
Comments
-
Sign Off
-
I.D.I. QAQC Inspector