Title Page

  • I.D.I. Job Number

  • Job Site Name

  • Conducted on

  • I.D.I. QAQC Inspector

  • Job Site Area of QAQC Inspection

  • Confirm for updated drawings, RFI's, plans & specs

  • Confirm MEP overhead complete & sign off prior to ceiling framing

  • Confirm MEP rough opening layout complete (lights, grilles, diffusers)

  • Confirm MEP access door

  • Confirm fire-stop or sound caulk at head of wall (if required)

  • Confirm fire-taping and sound caulking of wall above ceiling (if required)

  • Confirm studs/drywall grid are installed per plans/specs

  • Confirm backing installed at items hung from ceilings

  • Confirm ceiling & soffit heights per plans/specs

  • Confirm cleanup of our cartons and scrap materials

  • Inspect and walk the site with the G.C. Superintendent

  • Comments

  • Sign Off

  • I.D.I. QAQC Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.