Title Page

  • Client / Site

  • Conducted on (Date and Time)

  • Inspected by

  • Location
  • Take a photo of the workspace.

  • Use these score criteria for your inspection:
    1-COMPLETE. 2-INCOMPLETE.

  • Blow top of press once a month

  • Wipe down press after each shift

  • Clean bed once a week with stone

  • Put dies and punches in tool cabinets after usage

  • Do not leave die and punches behind die bed

  • Grease fittings and wheels inside machine

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.