Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Presentation & Functionality
-
Overall Cleanliness of Exterior is Acceptable. The lot clear of trash and garbage cans are tended to. Landscaping an parking lot are in good condition.
-
Overall cleanliness of the locker rooms is above average. (very clean for the time of day during the audit)
-
Less than 10 lockers out of order
-
Overall Cleanliness of the fitness Floor is Acceptable.
-
Less than 1-2 Out of Order signs are present on the Fitness Floor.
-
Overall Cleanliness of hallways, gym, stairwell and common areas is Acceptable.
-
Assets, furniture, carpet, tile, millwork etc. is meeting brand standards.
-
Proper HVAC function is evident throughout the entire club. No issues with tempertature, humidity, odors etc.
-
Cleaning Equipment (Tennant, Taski, Ninja, Vacuums, Clipper, Compuss etc.) are 100% functional. If they are not working, there is a plan in place to have them repaired.
-
Action Item(s) for follow thru:
-
Pictures
Communication & Brand
-
There is great communication in person and/or over the walkie talkies.
-
The FODH is engaged, positive and creating a great culture for the Team Members. Does it feel like a fun environment to work in.
-
Team Members have good energy and are friendly. They are engaging, positive, fun and interactive. They display the 5ft rule.
-
Uniform & Style Guide Adherence.
-
Action Item(s) for follow thru:
-
Pictures
Systems Binder is Completed and Being Utilized.
-
Department head walk thrus is being completed every day with evidence of it.
-
There is evidence of hourly updates by Ops Management OR the front line Team Members.
-
Daily Core Checklist and Daily Priority Tasks are being completed and assessed for completion. There are accurate assessments and signatures from management team after reviewing the work.
-
Sidekick is adjusted and accurate to the club. It is being actively assigned to them members.
-
Overnight Checklists are adjusted and accurate specific to your club.
-
Engineer and GM walk thrus are being completed with evidence of them.
-
Action item(s) for follow thru:
-
Pictures
Repair and Maintenance
-
R&M calculator is up to date and accurate.
-
A robust R&M list of 200-plus items is present on the planning tool. There is evidence of planning and assigning them to a month while maintaining budget concerns.
-
Planning and projecting to hit budget for the month and for the quarter.
-
Action item(s) for follow thru:
-
Pictures
Supplies
-
Supply calculator is up to date and accurate.
-
Weekly orders are planned and removed when appropriate in the process.
-
There is evidence of planning for supplies in other departments.
-
Planning and projecting to hit budget for the month and for the quarter,
-
Action item(s) for follow thru:
-
Pictures
Payroll
-
SOP scheduling Matrix is present an completed.
-
A good schedule is presented that meets the clubs needs according to budget.
-
The SOP payroll tracker is being used and the club is projecting to hit budget for the month and quarter.
-
Action item(s) for follow thru:
-
Pictures
Operations Summit
-
Proof of quality items being identified with detail descriptions present. There is no guessing about the issue.
-
Proof of quality of items necessary to ensure the clubs operation is being dissected and examined.
-
Proof of very good communication. There are weekly updates until completion of the task.
-
Proof of very timely completion of tasks. There should not be a lot of on-going of open work timelines.
-
Proof the Summit is driving the weekly business.
-
Proof that the GM/BA/FE/DH are all present and owning action items.
-
Action item(s) for follow thru: Will need to run the Summit, not the GM.
-
Pictures
GM Action Item(s) for Follow Thru:
Sign Off
-
On site representative
-
Auditor's signature