Job Information

  • Job No.

  • Customer

  • Conducted on

  • Conducted by

JIC

  • Have all processes marked on the JIC been signed off?

  • All processes on the JIC must be signed off prior to completing the final inspection.

    no label
  • Has the front of the JIC been completed in full?

  • The information on the JIC must be completed in full prior to completing the final inspection.

    no label
  • Has the interim inspection been completed?

  • Why was the interim inspection not completed?

  • Were any stock items required for this job? (including plate and round bar)

  • Stock Allocation Form No.

Dimensional Checks

  • Are there any applicable drawings for this job?

  • Will this dimensional check be for an individual item or an assembly?

  • Item
  • Item

  • Identification Number

  • Drawing No.

  • Measured Dimensions

  • Assembly
  • Assembly

  • Drawing Number

  • Measured Dimensions

Item Testing

  • Items to be checked

  • Item
  • Qty

  • Description

  • ID Number

  • Photo of ID Number & Other Relevant Stamping

  • Item Weight (kg)

  • Heat Treatment Required?

  • Why wasn't heat treatment required?

  • Heat Treatment

  • Harden Batch Number

  • Temper Batch Number

  • Stress Relieve Batch Number

  • Normalise Batch Number

  • Testing required

  • Proof Load Report Number

  • Magnetic Particle Report Number

  • Is the Magnetic Particle report dated after the Proof Load Report date?

  • The Magnetic Particle Report is not valid unless dated after the Proof Load Report. If there is not a Magnetic Particle Report dated after the Proof Load Report then it must be tested prior to dispatch.

    no label
  • Was the job Proof Loaded?

  • This question is applicable if the job was Proof Loaded. The Magnetic Particle Report is not valid unless dated after the Proof Load Report. If there is not a Magnetic Particle Report dated after the Proof Load Report then it must be tested prior to dispatch.

    no label
  • Ultrasonic Report Number

  • Dye Penetrant Report Number

  • Destructive Test Report Number

  • Function Test Report Number

  • Brinell Test Report Number

  • Calibration Report Number

Item Specific Checks

  • Does this job include any of the following items?

  • Gauge Check

  • Photo of Gauge Check

  • All Internal Components Fitted and Functioning?

  • All internal components must be fitted and functioning correctly prior to dispatching job to customer.

    no label
  • Orientation of a Pivot Pin

  • Dimension of Tailbolt a Buffer Pads

  • Modify Nut a Retention

  • Nut retention must be modified prior to job being dispatched to customer.

    no label
  • Orientation of the Bolt for the Modified Nut Retention

  • Bogie Assembly
  • Bogie Assembly ID Number

  • Bearings Installed

  • Why is this not applicable?

  • Why have the bearings not been installed?

  • Photo of Bearings Installed

  • Wheel Bearing Preload

  • Why is this not applicable?

  • Tab Washers Bent Over

  • Why is this not applicable?

  • Why have the Tab Washers not been Bent over?

  • Photo of Tab Washers Bent Over

  • Rail/Brake Gauge checked?

  • Why is this not applicable?

  • The rail gauge must be checked and comply prior to dispatching the job back to the customer.

    no label
  • Does the rail gauge comply?

  • Photo of Rail/Brake Gauge

  • The rail gauge must comply prior to dispatching the job back to the customer.

    no label
  • Brake Torque (Nm)

  • Entire Unit Greased?

  • Why is this not applicable?

  • Photo of Greased Unit

  • The entire unit must be greased prior to dispatching the job back to the customer.

    no label
  • Wheels Greased?

  • Why is this not applicable?

  • Photo of Greased Wheels

  • The wheels must be greased prior to dispatching the job back to the customer.

    no label
  • Centre Pin Retainer Fitted?

  • Why is this not applicable?

  • The centre pin retainer must be fitted prior to the job being dispatched back to the customer.

    no label
  • Photo of Centre Pin Retainer

  • Are M20 Bolts c/w 2 Spring Washers Fitted to Wheels (Overspeed)?

  • Why is this not applicable?

  • The M20 Bolts c/w 2 Spring Washers must be Fitted to wheels prior to the job being dispatched back to the customer.

    no label
  • Photo of Bolts and Spring Washers

  • Brake Flange Bolts are M20 Grade 12.9 Black

  • Why is this not applicable?

  • Brake flange bolts must be M20 Grade 12.9 Black.

    no label
  • Photo of Bolts

  • Brake Flange Bolts Torque to 650Nm

  • Why is this not applicable?

  • Brake flange bolts must be torqued to 650Nm.

    no label

Protective Coating

  • Is a protective coating required for this job?

  • Why is protective coating not required?

  • Item
  • Item

  • Identification Number

  • Protective Coating Complete?

  • Coating Colour/Type

  • Photo of protective coating

  • Is the protective coating adequate and good quality?

  • Why is the protective coating not adequate or high quality?

  • If protective coating is not adequate and high quality it must be fixed prior to being dispatched.

    no label
  • The protective coating must be completed prior to the job being dispatched.

    no label

Photos & Sign Off

Photos

  • Photo of Entire Job

  • Individual Items

  • Individual Item
  • Photo of Individual Item

Sign Off

  • Inspecting Officer

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.