Final Inspection Checklist for 12B Generators
-
Rotor Adapter Plate: Is the plate secured by two supports so that the rotor will not move?
-
Are leads secure for shipment?
-
Has generator been blown out and all debris cleared?
-
Is work-scope checklist signed off?
-
Verify that the Job Acknowledgement information matches the nameplates.
-
Make sure pictures are taken before motor is wrapped in plastic.
-
Is parts list in the job pouch from warehouse/receiving area?
-
Are all bolted connections tight?
-
Is prep & paint up to Mesa Joy Global quality standards?
-
Have job number and country of origin been stamped in unit?
-
Ensure job number, serial number, part number, and completion date is written on outside after generator is wrapped.
-
Ensure there are four (4) desiccant crystal packets added to the outside of a motor prior to wrapping the motor in plastic. (ALL MOTORS)
-
Merger and record the following readings: Rotor __________, Stator ________, prior to wrapping for shipment.
-
Inspector's name: