Title Page

  • It is compulsory that this checklist is completed weekly, any issues noted are to be forwarded to the Facilities Department to be rectified.
    Check to include
    1. Location of each unit is correct
    2. Ensure each unit is not obstructed
    3. Signage and labels are visible
    4. Extinguisher is undamaged and has not been operated
    5. Gauge and/or pin are in correct position and the needle is showing GREEN
    6. Seal is intact

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Inspection

  • 1 Entrance at loading area 6kg Dry Powder

  • Reason for Failure

  • 2 Back wall at shutter 6lt AFFF foam

  • Reason for Failure

  • 3 Back wall at shutter 2kg Co2

  • Reason for Failure

  • 4 Back wall at e.exit 6kg Dry Powder

  • Reason for Failure

  • 5 Loading area 2 6lt AFFF foam

  • Reason for Failure

  • 6 Loading area 2 5kg Co2

  • Reason for Failure

  • 7 At canteen / portacabin 2kg Co2

  • Reason for Failure

  • 8 At canteen / portacabin Fire blanket

  • Reason for Failure

  • 9 Back wall e.exit 6lt AFFF foam

  • Reason for Failure

  • 10 Back wall e.exit 6lt AFFF foam

  • Reason for Failure

Sign-Off

  • Completed By

  • Date & Time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.