Title Page
-
Conducted on
-
Prepared by
-
Location
Health and Safety Docs
-
Is there a fire strategy present
-
Compartmentation Summary
Penetrations
-
Floor
- 1st Floor
- 2nd Floor
- 3rd Floor
- 4th Floor
- 5th Floor
- 6th Floor
- 7th Floor
- 8th Floor
- 9th Floor
- 10th Floor
- 11th Floor
- 12th Floor
- 13th Floor
- 14th Floor
- 15th Floor
- 16th Floor
- 17th Floor
- 18th Floor
- 19th Floor
- 20th Floor
- Ground Floor
- Basement
- Other (please detil)
- Roof
-
Location
- Roof Void
- Electrical Riser
- Water Riser
- Dry Riser
- Comms Riser
- Above Compartment Wall
- Door Frame
- Stairwell
- Above Apartment
- Other (please state)
-
Which apartment
-
Detail
-
Detail
- Incomplete - The services pass through the structure with damaged or non-existent fire stopping which requires replacing to manufacturers standards by a third-party accredited contractor.
- Compartment Floor Detail - Services pass through the compartment floor without the required level of fire stopping, this requires fire stopping with intumescent materials to the manufacturers specification by a third party accredited contractor.
- Void - The void above the compartment wall housing a fire door is incomplete above ceiling level and requires the introduction of a retrospective compartment line to the required rating inline with the fire strategy.
- Rating - The fire stopping does not appear to be to the required rating to the compartment line as stated within the fire strategy.
- Door Frame - The fire stopping around the door perimeter is insufficient and requires resealing with intumescent materials to manufacturers specification.
- Foam - Excessive PU foam has been used which is incorrect in this instance and requires removal and replacing with intumescent materials to manufacturers specification.
- Other (detail in notes)
-
Size
-
Height (mm)
-
Width (mm)
-
Service penetration
- Cables
- Pipework
- Cable tray
- Trunking
- Other
-
Substrate
- Plasterboard
- Brick
- Block
- Wood
- Concrete
-
Recommended repair (this is a recommendation to how teh inspector would install Rockwool materials)
- Ablative batt board
- Intumescent mastic
- Instumescent cushions
- Fire board
- Pipe collar
- HP Mastic
- Fire Compound
- Cavity Barrier
- Intumescent Hatch
-
Rating