Title Page
-
Contract Name
-
Contract Number
-
Client
-
Conducted on
-
Prepared by
-
Location
-
Operatives No
Details of areas inspected
-
Do any matters require immediate attention?
-
Add in details of each area
Check list
-
Contract information sheet issued
-
Any exterior property damage?
-
Has a pre condition survey been issued
-
Roof covering & fixing spec issued
-
Rafters checked for damage
-
Fire stop installed to party wall
-
Insulation to loft
-
Eaves system installed correctly
-
Felt installed min 150mm lap
-
Battens correct eg. Gauge joints
-
Tiles nailed and clipped (check spec)
-
Verges nailed and clipped
-
Mortar work to be pointed NOT BRUSHED NO BACK BEDDING
-
Lead work including all saddles and soakers
-
C clips and crow clips installed to to hips and valleys
-
All rubbish and excess materials removed from property
-
Additional information requested from supervisor/ manager
-
Clearance of snagging item lists
-
Has the principle contractor signed handover sheet for all areas
-
Is the site clean and tidy
-
Are all works proceeding in accordance with agreed programme
Completion
-
Add signature