Information
-
Builder / Client
-
Site Address
-
Site Manager (Builder)
-
Prepared by
-
Start Date
-
Pictures
-
Comments
-
Read Folder
-
Read Purchase Order
-
Toilets
-
Shower Sets
-
Shower Mixer
-
Shower Heads
-
Shower Rails
-
Bath Set
-
Bath Mixer
-
Bath Outlet
-
Spa Set
-
Spa Mixer
-
Spa Outlet
-
Laundry Set
-
Laundry Mixer
-
Laundry Outlet
-
Kitchen Mixer
-
Washing Machine Stops High Wall
-
Washing Machine Stops Under Cupboard
-
Fridge Point
-
External Taps
-
Purple Taps
-
Green Taps
-
Tank Installed
-
Tank Pump Installed
-
Connect Wastes
-
Duo Valve Hot Water
-
500 KPA Valve at Meter
-
Solar Hot Water Panel Installed
-
Solar Hot Water Panel Connected
-
Test Cold Water
-
Test Hot Water
-
Test Wastes
-
Test Gas Line
-
Is Gas Service Line Installed
-
Turn Water Off Before Leaving Site
-
R3 Inspection Ready (Fit Off)
-
Down Pipes Installed And Complete (Please Specify Number and Types)
-
ORG Mound & Grate Installed
-
IS Cover Installed
-
Fit Off Complete
-
Comments
-
Signature