Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Check water meter
-
Check sewer shaft and gully will comply for inspection!
-
Are vents complete?
-
Has Gas meter been connected and buble leaked?
-
Are all Gas BBQ and internal Gas bayonets installed?
-
Has Hot and cold been looped in recess box?
-
Have hose taps and rain/recycled water signs been installed?
-
Has all fitout been completed?
-
Has every fixture been tested?
-
Make sure all rubbish and mess caused by us is cleaned up!
-
Comments- If job not complete what's left to do?