Compliance Questions

1. Documents

  • 1.1: Is the approved Contractor procedure present on-site?

  • Provide evidence

  • 1.2: Is the approved Inspection & Test Plan (ITP) available on-site?

  • Provide a clear photo of the document cover page.

  • 1.3: Is the isometric available?

  • Provide a photo of the BoM

2. Personnel

  • 2.1: Are all personnel involved in flange assembly certified in bolting and flange management?

  • 2.2: Is proof of qualification (card/certificate) available for all personnel working on flange management?

  • 2.3: Is a Contractor QC Inspector present on-site to verify activities?

3. Equipment

  • 3.1: Are all torque or tensioning tools uniquely identified with a serial number?

  • 3.2: Is all bolting equipment calibrated and certified for use?

  • 3.3: Is the equipment in good working order and free from damage?

4. Process

  • 4.1: Are workers aware of their specific roles and responsibilities according to the flange management procedure?

  • 4.2: Has a Toolbox talk been completed before work begins?

  • 4.3: Is the QC Inspector familiar with ITP requirements?

  • 4.4: Have bolts, gaskets, and nuts been checked and verified as correct prior to tightening?

  • 4.5: Are flange faces free from rust, dirt, and contamination before assembly?

  • 4.6: Is the correct bolt tightening sequence followed according to the criss-cross method?

  • 4.7: Are flange gaps acceptable before tightening, ensuring no visible misalignment

  • 4.8: Is Molykote 1000 lubricant applied correctly to all bolts?

  • 4.9: Are stud and nut stamps visible?

  • 4.10: Are the correct tightening values known?

  • 4.11: Is the tensioning value correctly applied for each stage?

  • 4.12: After tightening, is the joint visually inspected to ensure an even flange gap and obstruction-free bolting?

  • 4.13: Has the final stage 100% tightening verification been completed?

5. Records

  • 5.1: Has a Flange Management tag been applied to the joint upon completion?

  • 5.2: Has the P02A (ITR) for joint integrity been completed accurately?

  • 5.3: For joints not hydrotested, have these been recorded a witness joint on the joint map?

Feedback

  • Is there any way to improve our online form? Please enter the information below.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.