Title Page

  • Site conducted

  • Audit Title

  • Project Name

  • Conducted on

  • Prepared by

  • Location
  • Instructions
    -------------------
    1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link

TI Stone

  • Main Contractor:

  • Project Number:

  • Issued to:

  • QA Sheet No:

  • Elevation:

  • Level:

  • Comments:

TI Stone

  • Module end handed over to A2O by Caddick Construction<br> - Area to free of other trades

  • Personnel

  • Helping hand brackets installed to steelwork at correct centres with correct number of fixings. Dead point and sliding brackets set our as per A2O working drawings.

  • Personnel

  • L/T rails installed to helping hand brackets at correct cladding zone depth, with correct number of fixings into fixed / sliding point positions of brackets.

  • Personnel

  • Ensure the drip flashing is installed, with a maximum of 300mm centres between Tapcon fixings

  • Personnel

  • Ensure the Zeds are level and correct to the drawings, with a maximum of 300mm centres between Tapcon fixings

  • Personnel

  • Ensure the rails are level and correct to the drawings, with a maximum of 300mm centres between Tek Screw fixings.

  • Personnel

  • Ensure there are 2 fixings at the fix point on the top flange side by side.

  • Personnel

  • Ensure the Mid Rails have been fitted with 2 runs of gaskets and start/end rails with 1 run of gasket.

  • Personnel

Hold point sign off

  • A2O manager

  • Ensure that the dowel insert to undercut anchor is tightened using torque screwdriver set to maximum torque of 4.5 N/m.

  • Personnel

  • Ensure the stone has been gapped correctly with 8mm joints.

  • Personnel

  • Ensure the stone has 5mm of head clearance from the rail to allow for retro fitting.

  • Personnel

  • Ensure the stone is free from damage and ready to handover.

  • Personnel

Completion

  • Installer Signature:

  • A2O Signature:

  • Client Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.