Title Page
-
Conducted on
-
Prepared by
-
Location
-
Date:
-
Project
-
Client:
-
Project Number:
-
Contractor:
-
Site Conditions
Safety
-
Is correct PPE being used?
-
Are TTM’s in place if required?
-
Are materials being stored safely?
-
Are there any overhead power lines on site?
-
Are there any other safety concerns? If so detail, photograph and assign actions. Note: If there is an immediate risk to a persons safety then instruct the work to stop and contact the person in charge as well as Spiire Construction Team.
Environmental
-
Is contractor working in accordance with the approved EPA drawings?
-
Has there been any spills or leaks of hot asphalt mix, solvents or additives?
-
Has there been any spills or leaks of fuels or lubricants?
Material
-
Is the contractor working to the correct revision of drawings?
-
Is the select layer material approved?
-
Are the subbase and base layers material approved?
-
Has grading test for materials been received?
-
Is the primer approved?
Testing
-
Has sufficient compaction testing been done on base layer and does it comply?
-
Has sufficient compaction testing been done on sub base layer and does it comply?
-
Has sufficient compaction testing been done on select layer and does it comply?
-
Is moisture content within range for base, sub base and select materials?
Priming
-
Is primer required?
-
Has primer been placed appropriately with no wet areas?
-
Placement of Asphalt
-
Has existing surface been thoroughly swept?
-
Is pavement dry before placement?
-
Is correction course required to any areas?
-
Is pavement temperature sufficient to lay asphalt?
-
Does the pavement plan and equipment used minimise cold joints?
-
Were there any paver stoppages during placement?
QA
-
Have compaction and density test been done prior to placement and do they comply?
-
Is asphalt consistent with no segregation or bony sections?
-
Is ride ability acceptable?
-
Are joints acceptable?
-
Does level match existing?
-
Comments:
-
Name:
-
Role:
-
Signature: