Title Page
-
Site name
-
Conducted on
-
Conducted by
-
Prepared by
-
Location
-
Personnel
Boxing dimensions
-
Have the floor slab dimensions been checked of the construction issue drawings?
-
What drawing / page / issue number has been used to confirm the dimensions?
-
Have all rebates been checked against the architectural drawings and window shop drawings?
-
Have the accessible showers been boxed out with a 50mm step down?
Reinforcing
-
Has the mesh been checked for the correct height and have enough chairs been installed to keep at the correct height while pouring?
-
Have the hold down bolt positions been checked?
-
Check cover around perimeter of floor slab and adjust to meet specifications / site instructions
-
Check all floor starters / ties are folded down and tied to mesh
Services
-
Have the services locations been checked?
-
Have the services located below the floor slab been located and marked up on a drawing?
-
Who has taken the measurements?
-
Has the site Forman been given the dimensions?
Heights
-
Who is placing and how will the heights be managed?
General notes
-
Add media