Information
-
Document No.
-
Project Name and Number
-
Freyssinet Office
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Health and Safety Management
-
Has the previous audit report been closed out?
-
Is the project QSE Plan available in the site safety file?
-
Is it up to date and signed by all relevant parties?
-
Has the QSE Plan been briefed to all employees under Freyssinet supervision and are the records available in safety file?
-
Is the method statement available in site safety file?
-
Is a current and site specific risk assessment available in site safety file?
-
Have both Method Statement and Risk Assessment been briefed to all employees under Freyssinet supervision and records kept in site safety file?
-
Is the Environmental Aspects and Impacts register available in site safety file and has it been briefed to all employees under Freyssinet supervision?
-
Ensure all employees under Freyssinet supervision are given a site specific safety induction before the commencement of work?
-
Ensure all visitors, including client representatives, are given site induction before entering Freyssinet work area?
-
Are all safety induction records in the site safety file and up to date?<br>
-
Are all accident and incident reports available in the site safety file?
-
Are all QSE logs sheets complete and up to date (daily, weekly, monthly)?
-
Are tool box talks being done on a weekly basis and are records available in site safety file?
-
Consultation
-
Has a system been established for employees to comment and be consulted on Quality, Health, Safety and Environmental issues?
-
Is there a site suggestion box?
-
Are Health and Safety Management requirements being met?
Quality Management
-
Are ITP available on site and is it complete with the Material Installation Records?
-
Are material requisition documents available?
-
Are delivery notes available?
-
Are stock transfer records available?
Site Office Set Up
-
Is Freyssinet QSE policy on display in site office?
-
Are all emergency contact numbers and details, including main contractor, on display in site office?
-
Are the details of the nearest hospital or accident and emergency station available and displayed in office?
-
Are First Aid details displayed?
-
Are safety memos displayed and have they been briefed to staff in the form of a tool box talk?
-
Does the office have a clear line of communication (Internet, phone, fax)?
-
Are site office requirements being met?
Emergency Response Plan
-
Is there an emergency response procedure in place for evacuating the site in case of fire, flood, explosion etc.?
-
Are all employees under Freyssinet supervision aware of these procedures and are they part of the site specific induction?
-
Have emergency drills taken place?
-
Are there adequate means of raising the alarm and are they regularly tested?
-
Are all emergency escape routes clear and free from obstructions?
-
Are all escape routes and assembly points clearly marked?
-
Check that suitable fire extinguishers are provided and that they are maintained and in good condition?
-
Check all fire extinguishers have had an annual inspection?
-
Are emergency response requirements being met?
First Aid
-
Is there a Freyssinet First Aider available on site?
-
Are the names of these available and displayed in site office?
-
All First Aiders should be clearly identified on site through the use of an appropriate helmet sticker.
-
If no, is there adequate cover provided by the main contractor and are names and numbers on display in the site office?
-
The location of the first aid box should be indicated on the site notice board and the door of the room in which it is contained.
-
The first aid box should be clearly marked with a white cross on a green background and place where it can be seen.
-
Are the first aid contents being regularly checked and stock replenished?
-
The first aid box should only contain first aid materials.
-
Are first aid requirements being met?
Welfare
-
Are Freyssinet welfare facilities adequate for the number of employees on site?
-
Are they available to all Freyssinet employees?
-
Ensure that a supply of wholesome drinking water is available on site.
-
In the hotter months ensure that pre-hydration sachets are available to all employees under Freyssinet supervision.
-
Are suitable toilets available, are they kept clean and properly lit?
-
Are there adequate washing facilities available?
-
Are welfare facilities compliant?
Site Installations
-
Is there safe access and egress from all areas of site?
-
Are all walkways free from obstructions and stored materials?
-
Are all access routes adequately lit?
-
Have pedestrian walkways been provided to protect them from moving vehicles?
-
Is there adequate signage to warn both vehicle drivers and pedestrians of traffic routes?
-
Are loading and unloading areas clearly identified?
-
Are storage areas clearly identified?
-
Are procedures in place for the unloading of vehicles to prevent any fall from vehicle?
-
Are site installations compliant?
Scaffolding and working platform
-
Check that any scaffolding erection, alteration or dismantling is carried out by a trained and competent person.
-
Ensure that scaffolding is adequately tied to the building or structure to prevent collapse.
-
Check that there is double guard rails, toe boards and other suitable protection at every edge.
-
Check that all working platforms are fully boarded and that the boards are arranged to avoid tipping or tripping, I.e. no overlapping boards.
-
Are the working platforms provided the correct width as per Freyssinet requirements (between 800-1200mm)
-
Check that the scaffolding/work platform is strong enough to carry the weight of any materials, persons or anything else that will be stored or used on it.
-
Ensure that scaffolding is regularly checked by competent person and always after alteration.
-
Do scaffolding and working platforms meet Freyssinet requirements?
Work at height
-
Check whether the work can be carried out without working at height.
-
Ensure that safe access and egress has been provided to the work area.
-
Ensure that edge protection is provided to stop people or materials falling.
-
Ensure that all employees working at height are supplied with safety harness and that they have been trained in there use.
-
Ensure that the area directly below the work area is adequately barricaded and that warning signage has been erected.
-
Ladders are to be used for access and egress only and not for work platform, is this the case?
-
Ensure all ladders being used are in good condition, not split, warped or have damaged rungs.
-
Are the ladders suitable for the purpose?
-
Check that the ladders are resting against a solid level surface and not an insecure material.
-
Check ladders are secured to prevent them slipping sideways or backwards.
-
Are work at height procedures and regulations being met?
Personal Protective Equipment
-
Ensure all PPE is issued on a personal basis.
-
Ensure all Freyssinet employees, visitors and those under our supervision meet minimum standards required (helmet, shoes, vest, glasses & gloves)
-
Ensure all PPE being used is the correct size and fit for purpose of the job.
-
Are safety helmets in good condition and the latest supplied?
-
When working at height, ensure that the helmet being used has a three point chin strap.
-
Ensure all safety shoes being worn have steel toe cap.
-
Are all shoes in good condition?
-
Do site staff feel that the shoes are comfortable and happy with supplied shoe?
-
Are safety glasses being supplied and worn by the staff?
-
Is additional PPE available on the project and if so what.
-
Is sun block available on site for Freyssinet employees?
-
Are PPE requirements adequate?
Housekeeping
-
Ensure that all debris is regularly cleared in the Freyssinet work area.
-
Ensure all Freyssinet employees adapt the philosophy of "a tidy site is a safe site"
-
Ensure all Freyssinet materials are stored in an appropriate and safe manner.
-
Are waste disposal bins available and are they clearly marked?
-
Does the MC have a waste disposal plan and if so, are we following it?
-
Are housekeeping requirements adequate?
Environmental
-
Is there an environmental emergency plan in place by MC or Freyssinet?
-
If yes, is it communicated via site induction?
-
Have emergency drills taken place?
-
Are environmental guidance notes available on site?
-
Are there any noise or dust issues present on site and are they being controlled?
-
Are spill kits available on site?
-
Are spill kits located in the correct area?
-
Are staff and operatives aware of there location?
-
Is there a carbon footprint measurement or monitoring procedure for site?
-
Are environmental controls adequate?
Control of Substances Hazardous to Health (COSHH)
-
Have COSHH Assessments been carried out for all potentially hazardous materials and substances being used on site?
-
Are Material Safety Data Sheets available to assist with COSHH Assessment?
-
Have the hazards associated with the use of such materials been properly communicated to those affected?
-
Are alternative safer substances available which can be used as substitutes?
-
Ensure all dangerous and hazardous materials and substances are clearly marked and identified and stored in a secure location appropriate to the substance.
-
Have appropriate control measures and correct PPE been provided and are these being followed and used.
-
Are COSHH requirements adequate.
Electrical Equipment, Plant, Portable Power Tools and Hand Tools.
-
Check that low voltage tools and equipment are used wherever possible.
-
Check that all supply cables are free from cuts, splits or any other damage.
-
Check that all connections are properly made and that suitable plugs are used.
-
Ensure that cables and trailing leads are not trip hazards.
-
Power Tools
-
Check that all power tools have the safety guards fitted.
-
Ensure the tools are in a good state of repair.
-
Ensure that operatives are trained and competent.
-
Hand Tools
-
Ensure the right tools and equipment are being used for the right job.
-
Are all hand tools found to be in good condition and no defects.
-
Plant
-
Are stressing jacks in good condition?
-
Are stressing jacks certified and calibrated?
-
Are grouting machines in good condition and clean.
-
Are safety guards in place on grouting machine?
-
Are plant check lists completed and available on site?
-
General
-
Are all noise levels controlled?
-
Ensure Freyssinet employees have has training so they are aware of the risks from on site and what they need to do to avoid these risks.
-
Check that Freyssinet employees have had information and training so that they know what the risks of HAV (Hand Arm Vibration) are.
-
Ensure that tools and equipment are stored correctly to avoid damage.
-
Are Plant and Tool requirements adequate?
Lifting Operations
-
Is there a valid lifting plan for all operations?
-
Ensure a competent and appointed person co-ordinates all lifting operation.
-
Ensure that all lifting equipment has been installed and tested by a competent person and all valid certification to show this is available.
-
Check that all operators are trained and competent and have the valid license where applicable.
-
Check that the rated capacity/safe working load is clearly marked.
-
Ensure that cranes and other lifting equipment have sufficient space to operate and flag men are used where necessary.
-
Ensure lifting operations do not take place near overhead power lines or excavations.
-
All lifting equipment should have a full examination every 6 months.
-
Are lifting operations adequate?
Manual Handling
-
Check the suitability of using wheelbarrows, hoists, trollies or any other plant or machinery so that the handling of heavy objects is kept to a minimum.
-
Ensure all employees have been given adequate training in the risks of manual handling and the correct procedure to follow when doing so.
Other
Conclusion
Audit Risk Level
-
Risk rating for this Audit.
Sign Off
-
I confirm I have had the contents of this audit report explained to me and the actions to be taken.
-
Site In Charge
-
Person conducting the Audit
-
Audit concluded at
Closure
-
All actions in this report have been completed on:
-
Audit Report Closed: