Architectural Drawings Audit
-
Are there any drawn options on this homesite?
-
Plan type
- Single Level
- Two Story
- Basement
Architectural Drawings
General Items
-
Review Date of General Items
All General Locations
-
Are grade beams properly ran to accept loading from all bearing walls?
-
Are all necessary details listed for all slab applications?
-
Have all slab details been confirmed for accuracy?
-
Do window sill heights meet code?
-
Do window layouts allow adequate lighting to each room?
-
Have we utilized the most effective grouping of Clad vs. Vinyl if applicable? (I.e. Front vs. sides and rear)
-
Have all value added opportunities been reviewed with supplier and Design Team?
-
Are there any windows that don't offer value to the product and should be relocated or deleted?
-
Has the Master Plan Checklist been 100% completed by CAD and is it attached?
Elevations
-
Are window head heights clear of frieze and cornice?
-
Confirmed that window grids are consistent and match plans?
-
Verify that details match plan or if plan details need to change based on field conditions?
Framing
-
Review Date of Architectural Drawings
All General Areas
-
Identified all inefficient usage of space and made recommendations?
-
Identified specific location of where storage ends under stairs?
-
Has the head height clearance been verified at stairs?
-
Do we have attic access doors for all areas that are required by code?
-
Have Architectural Drawings, Master Rafter Layout Diagram, EWP Layout been reviewed and signed off on by framing subcontractor?
-
Are roof loads properly identified to show where roof should be braced?
Relax
-
Are all fireplace rough openings are listed on plans?
Master Bath
-
Are all necessary master tub dimensions listed on plan details? [Including but not limited to tub deck]
Garage
-
Is hot water heater location noted on plans?
Elevations
-
Ensured that all windows have a minimum of 6" clearance for flashing? [i.e. Dormers and windows above roof lines]
HVAC
-
Review Date of HVAC and Architectural Drawings
All General Areas
-
Are return air sizes and locations marked in plans?
-
Are all register locations marked on plans?
-
Have all chase locations been verified to ensure that they are properly being utilized? If not, have they been omitted from the Architectural Drawings?
-
I has the primary condensate line location been confirmed on plans?
-
Can any chase sizes be reduced on the Architectural Drawings?
-
Are thermostat locations properly noted in plans?
Attic
-
Has the location and proper orientation of all air handler units been identified on plans?
-
Identified HVAC platform location to ensure proper size and materials noted on plans?
Kitchen
-
Confirmed that center line of stove is indicated on plans?
Laundry
-
Confirmed that dryer is on right and washer is on left?
Garage
-
Will the location of the water heater create any issues with venting through roof?
Exterior
-
Confirmed condenser/AC pad locations on plans?
Plumbing
-
Review Date of Plumbing and Architectural Drawings
-
Identified manifold location? Is manifold location properly noted on plans?
-
Identified hose bib locations? (Ensure height takes into account exterior elevation materials)
-
Is hot water heater location noted on plans with correct framing detail?
-
Do we have 2x6 wall behind washer and dryer for plumbing and dryer vent?
-
Is location noted for drain with clean out in laundry room?
-
Should have 2x4 walls behind toilets unless 2x6 wall is required to accommodate for 3" drain?
-
Verified that no tub drains are on exterior walls, unless not feasible?
-
Verified that all exterior walls with tub drains are 2x6?
-
Verified that vertical drain risers are located so that clean outs are in approved locations? (Closets, cabinets, garage, storage, and laundry room)
-
Are all vertical drain risers located where they will not be in "waterfall" noise issue for Home Owner? (Away from Master Bedroom, Kitchen, Dining, Relax or Living)
-
Are all drain risers in the best locations for straightest and shortest runs to toilets with least amount of turns and drilling through floor joists?
-
Verified that 2x6 walls are provided for vertical drain risers?
-
Verified that horizontal drain piping in floor system does not interfere with restricting airflow?
-
Are distribution manifolds located so that they can be accessed by cutting Sheetrock if needed?
-
Verify that Distribution Manifolds are not located on exterior walls, but are in walls where there is plenty if work room and pipes can be connected in a neat and orderly manner?
-
Is hot water distributed throughout the home by the shortest routes from water heater for quickest delivery of hot water to fixtures? (The sink and master bath are the number one focus)
-
Verified that hose bibs are in the best practical locations for servicing all outside areas of the home?
-
Verified that hose bibs are not in a location where rolled up water hoses and sprayers would not become an eyesore?
Structural Drawings Audit
Structural Drawings
Framing
-
Review Date of Structural Drawings
Master Rafter Layout Diagram
-
Reviewed rafter layout for efficiency?
-
Does rafter layout parts list align with the design indicated on the Master Layout Rafter Diagram?
-
Has Master Rafter Layout Diagram been reviewed and signed off by the Framing Subcontractor?
EWP Plans
All General Areas
-
Reviewed EWP plan to identify inefficient usage of LVL material?
-
Does the EWP plan parts list align with the design indicated on the plans?
-
Are all load bearing walls and/or point loads noted on plans to to show proper locations?
-
Reviewed wall placement of 2nd Floor walls to check for areas to stack in order to create greater efficiency for EWP plan layout materials?
-
Reviewed ceiling joist layout, orientations and sizing for efficiency?
-
Is plumbing CAD drawing properly overlaid onto EWP plan drawing?
-
Are I joists properly spaced to to accept the installation of air return?
-
Reviewed EWP plan to identify inefficient usage of I-joist material?
HVAC
-
Review Date of HVAC and Structural Drawings
EWP Plan
-
Do we have HVAC layout mapped out on EWP plan?
-
Is each run easily identifiable on EWP plan?
-
Identified main truck line locations and ensured I-joists are properly spaced?
-
Confirmed that I-joist layout provides proper spacing above range for vent hood to outside.
-
Reviewed precut hole placement on EWP drawings to accommodate flex layouts? Do any holes need to be added or taken away.
Plumbing
-
Review Date of Plumbing and Structural Drawings
EWP Plan
-
Are I-joists properly spaced to accept the proper installation of all plumbing?
Parts List Audit
Parts List
Framing
-
Reviewed Parts List
-
Verified all materials by drop? [Ensure material is located in proper drop]
-
Verified miscellaneous details in parts list?
-
Verified All Material Counts and Updated Master Parts List?
Field Verify Audit
Field Verify
Framing
-
Field Audit Completion Date
-
Verified all material counts?
-
Verified material counts in basement?
-
Basement 2x4x14'
Plate Type
-
Plate Dimensions and Type
- 2x4x14 Treated
- 2x4x14 SYP
- 2x6x14 Treated
- 2x6x14 SYP
-
Actual Field Count
-
Basement Studs
Stud Type
-
Stud Dimensions
- 2x4x92-5/8"
- 2x6x92-5/8
- 2x4x104-5/8
- 2x6x104-5/8
- 2x4x116-5/8
- 2x6x119-5/8
-
Actual Field Count
-
Basement OSB
OSB Type
-
OSB Count
- Sheathing
- Roof Decking
- Shear Wall
-
Actual Field Count
-
Verified material counts for first floor?
-
First Floor 2x4x14'
Plate Type
-
Plate Dimensions and Type
- 2x4x14 Treated
- 2x4x14 SYP
- 2x6x14 Treated
- 2x6x14 SYP
-
Actual Field Count
-
First Floor Studs
Stud Type
-
Stud Dimensions
- 2x4x92-5/8"
- 2x6x92-5/8
- 2x4x104-5/8
- 2x6x104-5/8
- 2x4x116-5/8
- 2x6x119-5/8
-
Actual Field Count
-
First Floor OSB
OSB Type
-
OSB Count
- Sheathing
- Roof Decking
- Shear Wall
-
Actual Field Count
-
First Floor Floor Decking
Type of 3/4" Decking
-
3/4" T&G Floor Decking Count
- 3/4" Commodity Decking
- 3/4" 50 Year Decking
-
Actual Field Count
-
Verified material counts for second floor?
-
Second Floor 2x4x14'
Plate Type
-
Plate Dimensions and Type
- 2x4x14 Treated
- 2x4x14 SYP
- 2x6x14 Treated
- 2x6x14 SYP
-
Actual Field Count
-
Second Floor Studs
Stud Type
-
Stud Dimensions
- 2x4x92-5/8"
- 2x6x92-5/8
- 2x4x104-5/8
- 2x6x104-5/8
- 2x4x116-5/8
- 2x6x119-5/8
-
Actual Field Count
-
Second Floor OSB
OSB Type
-
OSB Count
- Sheathing
- Roof Decking
- Shear Wall
-
Actual Field Count
-
Second Floor Floor Decking
Type of 3/4" Decking
-
3/4" T&G Floor Decking Count
- 3/4" Commodity Decking
- 3/4" 50 Year Decking
-
Actual Field Count
-
Verified All Material Counts for Elevations?
-
Siding and Cornice
Type of Siding
-
Singing Type
- 8-1/4"x12' Hardie
- 5-1/4"x12' Hardie
- 5-1/4"x12' Artisan
- 1x4x12 Hardie
- 1x6x12 Hardie
- 1x8x12 Hardie
- 1x10x12 Hardie
- Brick
-
Actual Field Count
Bathroom
-
Do all cased openings adjacent to kitchen cabinet uppers leave enough room so that crown molding does not interfere with casing? [Need X" from back of cabinet to leading edge of rough opening]<br>
Kitchen
-
Do all vanity tops have enough room so as to not interfere with door casing? [Need 25" Fromm back of cabinet to leading edge of door rough opening]
HVAC
-
Review Date of HVAC Field Audit
-
Do we have proper clearances for vent pipes?
-
Are there any supply runs in conflict with lighting or plumbing?
-
What issues occurred during rough installations that require design changes?
-
Should this floor plan require multiple returns?
Plumbing
-
Review Date of Plumbing Field Audit
-
Will distance to hot water heater create the need to rough for a recirculating pump?
-
Reviewed plumbing rough layout to confirm most efficient layout of drains and supply piping?
-
Do any plumbing rough drain lines restrict airflow? If so, should plumbing of HVAC design be altered?
-
Has home been walked with Freddie Hale and plumbing subcontractor to evaluate most efficient layouts and/or value added opportunities?
-
Ensured that all vent pipes vent to rear of home or in areas that are not visible from street?
PO Details Audit
PO Details
General Items
-
Review Date of General Items and PO Details
-
Has the window parts listed provided by subcontractor been reviewed?
HVAC
-
Review Date of HVAC and PO Details
-
Has Po been reviewed with HVAC contractor?
-
Has the sizing of the units been reviewed with the HVAC contractor?
Plumbing
-
Review Date of Plumbing and PO Details
-
Has PO been reviewed by plumbing contractor?
HVAC Rough Diagram Audit
HVAC Rough Diagram
-
Reviewed HVAC Rough Diagram
HVAC
-
Dow we have HVAC layout mapped out from HVAC contractor?
-
Reviewed overall HVAC plan. Are there any value added opportunities in the design?
Master Plumbing Diagram Audit
Master Plumbing Diagram
-
Reviewed Master Plumbing Diagram
Plumbing
-
Has the Master Plumbing Diagram been completed by Freddie Hale?
-
Are all clean out sizes and locations noted on Master Plumbing Diagram?
-
Are clean out locations placed in the most aesthetic and efficient locations?
-
Is location of sleeve for sewer outfall noted on Master Plumbing Diagram?
-
Has Master Plumbing Diagram been reviewed and signed off by plumbing contractor?
-
Has Master Plumbing Diagram been added to set of Architectural Drawings for this plan?