Title Page

  • Contract Number

  • Customer Name

  • Product Type

  • Inspected By

  • Inspection Date

  • Drawing Number

INSPECTION & TEST REQUIREMENTS

  • Is all required certification available - NDE Weld Paint etc

  • If required has ITP been signed off at all stages

  • Have all signed job cards, routings etc been scanned into contract file?

Frame Work Inspection Record

  • Is framework free from Dents Scratches or obvious damage

  • Pre Weld Dimensions Correct as per drawing

  • Post Weld Dimensions Correct as per drawing

  • Is all weld continuous and acceptable to Drawing / SOP`s No pinholes , cracks ,holes to be present)

  • All seams on frame work to inside of frame?

  • Any feet brackets flanges etc welded in correct orientation

  • Are Lifting Points / Lugs fitted and adequately welded?

  • If Applicable: Any Galvanising relief holes or paint holes required in the framework or pre-drilled?

  • Frame Work Trial Built pre paint / galvanising

  • Correct production labels attached to work pre paint / galvanising

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.