Title Page

  • Framing inspection

  • Batch

  • Conducted on

  • Prepared by

Top & Bottom Track

  • Are all walls laid out correctly?

Door Frames

  • Is door frame level and set to the correct width?

  • Are ADA clearances met?

  • Is door frame anchored to studs in all locations?

Studs

  • Are studs installed on layout?

  • Are studs screwed off in all locations?

  • Are studs in good condition and installed plumb?

  • Is headwall stud layout correct?

Shaft Walls

  • Does shaft framing line up with standard wall framing?

  • Is shaft liner installed correctly and all penetrations sealed?

Framed Openings

  • Are all openings the correct size?

  • Are openings square and straight?

Top Out

  • Have all existing objects been cut around correctly?

  • Has everything been insulated that is topped out?

Top of Wall

  • Have all top of wall conditions been sealed?

Fire Taping

  • Have all joints been fire taped?

Labeling

  • Are all rated walls labeled correctly?

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.