Title Page
-
Site conducted
-
Conducted on
-
Engineer
-
Location
-
0800 054 1487
Documents
-
Maintenance Logbook
-
Installation Pack
-
CE Installer Marking
-
Maintenance plan
Gate Maintenance
-
Confirm any existing faults or issues before work starts.
-
Details of issues to report
-
Make & Model of system
-
Photos of Gates & Controls
-
Manual Release Working
-
Battery Backup Tested
-
Mains supply Tested and cables secure.
-
Control box clear, free from debris and sealed.
-
Cables secured, no loose connections
-
Remote fob tested
-
Motor housing and fixings secure
-
Motor limits open & close adjusted and tested
-
Motor boxes cleaned and lubricated
-
Ground around motor and tracks cleared
-
Rollers & hinges tightened, and lubricated
-
Keypad tested as operational
-
Photocells tested and cleaned
-
Photocell batteries replaced
-
Ground loop tested
-
Safety edges tested
-
Safety edge batteries replaced
-
Warning signage Installed
-
Digital timber clock (update time)
-
Test electric lock (locking)
-
Dynamic Risk Assessment (Gate Safe Regulations)
-
Safety issues
-
Force Test Result
-
Do the gates stop and reverse upon impact