Title Page
-
Conducted on
-
Prepared by
-
Location
-
Project ID
-
Project Name
-
Service Provider
-
Contractor Onsite
Daily Requirements
-
Pipeline Security / Daily route patrols?
Monthly Requirements
-
SAP up to date
-
Pipeline encroachment incidents
-
Third party Damages
-
Number of pipeline inspections
-
Systematic leakage survey of mains
-
Bridge inspections
-
CP performance
-
Potential survey of TP mains
-
CPU inspections
-
Potential survey of TP mains
-
Maintenance and breakdown of pressure reduction facilities and valves
-
SCADA Maintenance and Breakdown
6 Monthly Requirements
-
Regulator stations and City Gates / without SCADA
-
Structural Housing / Operational Checks
-
TP Industrial Regulator / Meter Installations Maintenance / Inspection and Prevention Maintenance activities
8 Monthly Requirements
-
Regulator stations and City Gates / with SCADA
-
Water Bath/shell & Tube & Electric Gas Pre-heater / Water Bath maintenance
12 Monthly Requirements
-
Water Bath/shell & Tube & Electric Gas Pre-heater / Water Bath maintenance
-
Regulator stations and City Gates / All sites operational checks
-
Pipe Supports / Pipe coating, transitions, pipe supports & corrosion (visual)
-
Pig Traps / Pipe coating, transitions, pipe supports & corrosion (visual)
-
Water Bath/shell & Tube & Electric Gas Pre-heater / Electric Heaters
-
Ground Entry / Pipe coating, transitions, pipe supports & corrosion (visual)
-
Tunnels and Valve Pits / As part of valve maintenance
-
SCADA / SCADA Maintenance
Pipeline Patrol Verification Audit
-
Are marker signs to standard?
-
Are CP test points in good condition
-
Are line valves accessible and in good condition?
-
Are branch valves accessible and in good condition?
-
Are regulator pits and bollards in good condition?
-
Are easements marked, maintained and visible?
-
Has vegetation been maintained?
-
Are ground conditions appropriate e.g. erosion?