Information
-
Site
-
Inspection area
-
Conducted on
-
Inspection team
Fixed Plant
Environmental Management
-
Have area inspections been completed by area owner?
-
Have all actions from previous work area inspections been closed?
-
Does the work area adequatly manage stormwater from entering potentially contaminated areas?
-
Does the work area retain potentially contaminated stormwater for treatment?
-
Is there evidence of correct waste segregation?
Hydrocarbon and chemical storage
-
Are bulkies and chemicals stored appropriately in cabinets or on adequate bunds with jetting protection?
-
Does the area have bunding?
-
Is the bund in good condition with bund valve closed and locked?
-
Are bunds appropriately designed to Australian and Rio Tinto Standards?
-
Are bunds free of vegetation, rubbish or items which may reduce its capacity?
-
Is the area free of hydrocarbon or chemical spills?
-
Is liquid resulting from spills or leaks recovered as soon as practicable?
-
Does the work area have sufficient stocked still kits?
Sediment control
-
Are ore spillage levels at a minimum and disposed of correctly?
-
Are sumps in good condition with adequate freeboard?
-
Are drying beds in good condition with sediment levels at an acceptable level?
-
Are dust controls in place and operational?
-
Is housekeeping in the area good?
Summary and corrective actions.
-
Was the facility operating as designed with no actions required?
-
Required Actions
-
Actions required
Action