Information
-
Inspection Area
-
Site
-
Conducted on
-
Prepared by
-
Location
-
Inspection team
Environmental Management.
-
Have area inspections been completed by area owner.
-
Have all actions from previous work area inspections been closed?
-
Does the work area adequatly manage stormwater?
WFSF Operation
-
Have daily area inspections been completed to satisy WFSF Operations manual?
-
Has the WFSF Operations meeting been conducted to review monitoring data?
-
Does the facility have sufficient freeboard to meet licence requirements?
-
Is the embankment wall in good condition, free of cracking and scouring?
-
Is the facility operated in accordance with the approved decant strategy?
-
Is the work area owner aware of the current deposition strategy, is deposition occuring in line with the approved strategy.
-
Has clearing occured ahead of Operations?
-
Is the decanat pond managed to keep water away from the embankment and allowing water to be collected by the decant structure?
WFSF monitoring
-
Has the WFSF Operations meeting been conducted to review monitoring data?
-
Are Piezo’s within the facility working correctly and recording data?
-
Has an investigation determined if the Piezo is dysfunctional?
-
Have relevant notifications been raised with the DMP?
Decant Infrastructure
-
Is decant working in line with Operations strategy?
-
Are decant volumes recorded and tracked?
-
Is the decant pump free of hydrocarbon staining from refueling or leaks?
Summary and corrective actions
-
Is the facility considered compliant with relevant approvals and regulations?
-
Are actions required to rectify issues in this audit?
Action