Title Page
-
A WASP must be completed daily.
-
Branch:
-
Date:
-
Prepared By:
-
Location:
-
Job Ref:
PU Prints attached
-
Add media
Before You Start
-
Describe the work to be undertaken.
-
Are you and your team authorised to carry out this work? i.e. Supervisor Approval / Council Notice in Place.
-
Do you and your team have the correct knowledge & competence to complete the work safely?
-
Have you & your team read & understood the Risk Assessments & Method Statements associated with the work to be carried out?
-
Add any additional comments you may have regarding the Risk Assessment & Method Statements:
-
Do you have the correct information on the job, i.e. drawings?
-
Do you and your team have the correct mandatory PPE for the tasks to be undertaken?
-
Have you considered the weather conditions
-
Have you identified any slips or trip hazards
-
Are work vehicles parked safely and not causing any obstructions to third parties?
-
Is a suitable, fully pressurised Fire Extinguisher available?
-
Do you have a Spill Kit available?
-
Are First Aid & Eye Wash Kits available?
-
Do you know the location of the closest Welfare Unit?
-
State the location:
-
Please contact your supervisor for welfare locations:
-
Is the work area safe to begin work? (Provide Pictures)
Work To Be Undertaken
-
Site Setup:
-
Red Book - Safety at Street Works & Road Works
-
Is sufficient SLG available for the work to be carried out safely:
-
Ensure sufficient sandbags are used to secure equipment:
-
All Warning Signage to be in place as per Chapter 8:
-
All work activities to take place within a securely barriered site:
-
Ensure there is no risk to public safety from the way the site has been set-up:
-
Add photos of site setup:
-
Working Near/On Carriageway:
-
Class 3 Hi-Viz Clothing must be worn:
-
Never work on live carriageways, i.e. work from the safe side of vehicles & within site boundaries away from live traffic.
-
Excavation Work:
-
HSG 47
-
Calibrated Cat & Genny must be used:
-
Identified services to be marked up:
-
Pre-use check of excavator by competent person:
-
Banksman to be used while mechanically excavating:
-
No mechanical digging within 0.5m of known services:
-
Use of Power Tools and/or Hand Tools:
-
Tools inspected & in good working order:
-
Users to be trained & competant:
-
Choose the correct tool for the task:
-
Vibrating Tools can cause HAVS, refer to HAVS Risk Assessment for more detail:
-
Hearing protection to be worm when exposed to high noise levels: (Refer to Noise Exposure Risk Assessment for more details)
-
Refuel petrol-powered tools only while using a drip tray:
-
Manual Handling:
-
Assess all Manual Handling tasks using, L.I.T.E Acronym:
-
Mechanical Aids to be used whenever possible:
-
Maintain good posture when manually handling objects:
-
Ensure the transit area is free of slip or trip hazards & the area is well lit:
-
Ensure there is a safe designated laydown area for the object(s) being moved:
-
Working In, Manholes, Chambers etc.
-
Visual Inspection of work area:
-
Confined Space training required:
-
Perform Gas Test with calibrated Gas Detection Unit: (Verify GDU is within calibration date)
-
2-Man minimum operation:
-
Beware of vermin:
-
Working With Hazardous Substances:
-
Store Hazardous Substances correctly, as per CoSHH Assessments:
-
Wear appropriate PPE for working with the hazardous substance:
-
Refer to COSHH Assessments and Substance Data Sheets for further safety information:
-
Traffic Management:
-
(Pink Book) Safety at Streetworks & Roadworks
-
Traffic Management to be set up as per Chapter 8 or site-specific drawings:
-
Do not exceed traffic flows and site lengths as stated in Chapter 8 or Safety at Street Works and Road Works Booklet:
-
Ensure all signs are visible to traffic and free from defects:
-
Ensure sufficient sandbags are used to secure equipment:
-
Once TM is in place, assess if the setup is coping with the type and speed of traffic & amend if required:
-
Work At Height:
-
Inspect all W@H equipment & accessories before use:
-
Verify LOLER thorough inspections, (6 monthly for equipment that lifts people & lifting accessories):
-
Confirm ground conditions are safe for W@H operation:
-
Consider PPE requirements for the W@H task:
-
Set up an exclusion zone below the working area if there is a risk of falling objects:
-
Additional Hazards:
-
Add additional hazards here:
PPE Requirments
-
PPE must be inspected daily, with any defective items reported and replaced immediately.
-
Select PPE Requirments:
-
Please Specify:
Acknowledgement
-
Gang Lead:
-
Gang Member 2:
-
Gang Member 3
-
Gang Member 4
Visitor Sign Off:
-
Add signature
End of Shift:
-
Provide picture of how the site will be left at the end of the shift:
-
Gang Lead Sign Off: