Title Page

  • A WASP must be completed daily.

  • Branch:

  • Date:

  • Prepared By:

  • Location:
  • Job Ref:

PU Prints attached

  • Add media

Before You Start

  • Describe the work to be undertaken.

  • Are you and your team authorised to carry out this work? i.e. Supervisor Approval / Council Notice in Place.

  • Do you and your team have the correct knowledge & competence to complete the work safely?

  • Have you & your team read & understood the Risk Assessments & Method Statements associated with the work to be carried out?

  • Add any additional comments you may have regarding the Risk Assessment & Method Statements:

  • Do you have the correct information on the job, i.e. drawings?

  • Do you and your team have the correct mandatory PPE for the tasks to be undertaken?

  • Have you considered the weather conditions

  • Have you identified any slips or trip hazards

  • Are work vehicles parked safely and not causing any obstructions to third parties?

  • Is a suitable, fully pressurised Fire Extinguisher available?

  • Do you have a Spill Kit available?

  • Are First Aid & Eye Wash Kits available?

  • Do you know the location of the closest Welfare Unit?

  • State the location:

  • Please contact your supervisor for welfare locations:

  • Is the work area safe to begin work? (Provide Pictures)

Work To Be Undertaken

  • Site Setup:

  • Red Book - Safety at Street Works & Road Works

  • Is sufficient SLG available for the work to be carried out safely:

  • Ensure sufficient sandbags are used to secure equipment:

  • All Warning Signage to be in place as per Chapter 8:

  • All work activities to take place within a securely barriered site:

  • Ensure there is no risk to public safety from the way the site has been set-up:

  • Add photos of site setup:

  • Working Near/On Carriageway:

  • Class 3 Hi-Viz Clothing must be worn:

  • Never work on live carriageways, i.e. work from the safe side of vehicles & within site boundaries away from live traffic.

  • Excavation Work:

  • HSG 47

  • Calibrated Cat & Genny must be used:

  • Identified services to be marked up:

  • Pre-use check of excavator by competent person:

  • Banksman to be used while mechanically excavating:

  • No mechanical digging within 0.5m of known services:

  • Use of Power Tools and/or Hand Tools:

  • Tools inspected & in good working order:

  • Users to be trained & competant:

  • Choose the correct tool for the task:

  • Vibrating Tools can cause HAVS, refer to HAVS Risk Assessment for more detail:

  • Hearing protection to be worm when exposed to high noise levels: (Refer to Noise Exposure Risk Assessment for more details)

  • Refuel petrol-powered tools only while using a drip tray:

  • Manual Handling:

  • Assess all Manual Handling tasks using, L.I.T.E Acronym:

    T.I.L.E Manual Handling Diagram.png
  • Mechanical Aids to be used whenever possible:

  • Maintain good posture when manually handling objects:

  • Ensure the transit area is free of slip or trip hazards & the area is well lit:

  • Ensure there is a safe designated laydown area for the object(s) being moved:

  • Working In, Manholes, Chambers etc.

  • Visual Inspection of work area:

  • Confined Space training required:

  • Perform Gas Test with calibrated Gas Detection Unit: (Verify GDU is within calibration date)

  • 2-Man minimum operation:

  • Beware of vermin:

  • Working With Hazardous Substances:

  • Store Hazardous Substances correctly, as per CoSHH Assessments:

  • Wear appropriate PPE for working with the hazardous substance:

  • Refer to COSHH Assessments and Substance Data Sheets for further safety information:

  • Traffic Management:

  • (Pink Book) Safety at Streetworks & Roadworks

  • Traffic Management to be set up as per Chapter 8 or site-specific drawings:

  • Do not exceed traffic flows and site lengths as stated in Chapter 8 or Safety at Street Works and Road Works Booklet:

  • Ensure all signs are visible to traffic and free from defects:

  • Ensure sufficient sandbags are used to secure equipment:

  • Once TM is in place, assess if the setup is coping with the type and speed of traffic & amend if required:

  • Work At Height:

  • Inspect all W@H equipment & accessories before use:

  • Verify LOLER thorough inspections, (6 monthly for equipment that lifts people & lifting accessories):

  • Confirm ground conditions are safe for W@H operation:

  • Consider PPE requirements for the W@H task:

  • Set up an exclusion zone below the working area if there is a risk of falling objects:

  • Additional Hazards:

  • Add additional hazards here:

PPE Requirments

  • PPE must be inspected daily, with any defective items reported and replaced immediately.

  • Select PPE Requirments:

  • Please Specify:

Acknowledgement

  • Gang Lead:

  • Gang Member 2:

  • Gang Member 3

  • Gang Member 4

  • Visitor Sign Off:
  • Add signature

End of Shift:

  • Provide picture of how the site will be left at the end of the shift:

  • Gang Lead Sign Off:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.