Information
-
Client
-
Site Address
-
EICR Contractor
-
EICR Contractor Engineer
-
Date the EICR to be audited was completed
-
Audit date
-
Audit conducted by
Engineer report
EICR content accuaracy - NOTE: THIS AUDIT REPORT IS NOT IN ANY WAY A PART OR FULL REPRODUCTION OF THE EICR PRODUCED.
-
Do the Supply Characteristics and Earthing Arrangements match what is recorded on the report produced? (incl. Distributors Facilty/Earth Electrode)
-
Does the main earth conductor size and main protective bonding conductor sizes match what is recorded on the report produced?
-
Does the main protective bonding conductor/s connection or continuity reflect what is recorded on the report produced? (note services applicable)
-
Does the Ze and PFC and/or Zdb and Ipf (incl PSSC) reflect what is recorded on the report produced? (add photos if possible)
-
Are all observations recorded on the EICR noted correctly including the appropriate classification code, as per the industry guide - Electrical Safety First EICR Best Practice Guide current version? (followed as closely as possible to include SPD recommendation and AFDD recommendation if applicable - do not include any observations found to be missed)
-
Have any further suggested C1/C2 or FI observations been found that were not recorded? (either via visual inspection or via sample testing. Be aware of any remedial works carried out since original EICR completed. Do not include damage/wear and tear defects confirmed caused since EICR) Include photos.
-
Have any further suggested C3 observations been found, not recorded? (either via visual inspection or sample testing. As above regarding any remedial works/damage since EICR) Include photos
-
Are any DNO/meter operator equipment discrepencies applicable for an 'X' observation code correctly recorded ? (Note any DNO/Meter operator equipment observations missed) Include photos
-
Is the EICR Schedule of Inspections completed correctly - matching observations recorded on the EICR? (Do not note anything related to missed observations)
-
On completion of the EICR, has a BS 7671 compliant Periodic Inspection Test notice been placed at the origin of the installation or at Consumer Unit and correctly completed? Include photo
Circuit Details accuracy
-
Does the consumer unit/DB circuit schedule match the details recorded on the report submitted?
-
Does the Type of Wiring code and Cable Installation Reference Methods match what is recorded on the report submitted?
- Yes
- No
- Unable to confirm fully due to access
-
Does the number of points of circuit/s sampled match those recorded on the report submitted? (note which circuit/s sampled, if access possible)
-
Does the OCPD details and the RCD/RCBO details including Type and rating match those recorded on the report submitted?
-
Other Test Results fields completed correctly i.e IR test voltage, LIM L-N IR tests, polarity, RCD/AFDD test button operation?
EICR Sample test results accuracy - mark as N/A circuits either not present or not selected for sample tests.
-
Does any Lighting Circuit/s R1+R2 or R2 sample tests reflect those recorded on the report submitted? (note which circuit/s checked, EICR test result and photo)
-
Does the Cooker and/or Hob circuit R1+R2 or R2 sample tests reflect those recorded on the report submitted? (include EICR test result and photo)
-
Does the Shower circuit R1+R2 or R2 sample tests reflect those recorded on the report submitted? (if more than one electric shower note which circuit was checked, include EICR test result and photo)
-
Does the Immersion and/or Central Heating circuit R1+R2 or R2 sample tests reflect those recorded on the report submitted? (note which circuit checked, include EICR test result and photo)
-
Does the Fire detection circuit R1+R2 or R2 sample tests reflect those recorded on the report submitted? (if present) (Include EICR test result and photo)
-
Does any Ring Circuit/s 'end to end' conductor continuity sample tests reflect those recorded on the report submitted? (note which circuit/s checked, include EICR test result and photo)
-
Does any Ring Circuit/s R1+R2 sample tests reflect those recorded on the report submitted? (to reflect Figure of 8 test. Note which circuit/s checked, EICR test result and photo)
-
Does any Radial circuits for socket-outlets R1+R2 sample tests reflect those recorded on the report submitted? (note which circuits checked, include EICR test result and photo)
-
Does the Insulation resistance sample tests reflect those recorded on the report submitted? (note either individual circuits or whole installation/group of circuits as applicable. Include EICR test result and photo)
-
Does the Zs sample tests reflect those recorded on the report submitted? (note which circuits were checked, include EICR test result and photo)
-
Does any RCD (incl RCBO) sample tests reflect those recorded on the report submitted? (x1 instrument trip test and test button operation. Include EICR test result and photo)
-
Is any AFDD manual test button operation satisfactory and matching what is recorded on the report submitted? (if applicable)
-
Do any other circuit/s sample tests reflect those recorded on the report submitted? (state circuit/s and tests performed, include EICR test result and photo)
Audit conclusion
-
Was the EICR submitted an accurate assessment of the installation?
-
If occupant present, how long was the engineer on site?
-
If applicable, has any debris created during the EICR not been cleaned up or any making good required not carried out?
Additional comments
-
undefined
Signature
-
Auditor