System installed

Is this a complete system?

Enter addition panel location in relation to existing panels.

Inverter details

Manufacturer

Model

Picture of inverter - front and label
Panel details

Manufacturer

Model

Wattage per panel

Number of panels

GET360 system details
Inverter serial numbers

Wifi name

Wifi password

Extra Works

Requested by customer on site.

Was any extra work completed at the customers request outside of job description?

Details of extra works requested.

Extra work quoted?

$

Customers signature:
Extra work completed

Full switch board upgrade (replace meter box)

Full backing switch board upgrade (replace of asbestos board)

Isolation upgrade to ELCB from fuses

Change over switch

Timer switch

Other extras

Details:

Form A details

Existing meter #

Appointment required

Number of phases

Meter location

Main switchboard location

Supply connection

Property pole

Maximum demand (amps/phases)

Cable size (mm)

Number of meters

Controlled Tariff

Notes:

Install Checklist

Formbay complete

Invoice given to customer

GET sign, bin sticker, street flyers

Form A complete

Outstanding work pending

Outstanding work

Details (work description)

Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.