Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • 11.1. A plan, describing methods to minimise waste and maximise efficient use of resources must be implemented and monitored

  • 11.2. Sources of non-potable water must be identified and assessed for use for construction and/or sanitary purposes

  • 11.3. Water minimising controls , renewable energy sources and energy efficient devices must be assessed for use during the life cycle of a project

  • 11.4. When purchasing or hiring facilities, energy and water efficient options must be assessed for use during the life cycle of a project

  • 11.5. All workplaces must recycle construction and demolition waste, paper, cardboard, electronics, printer cartridges, fluorescent lights, glass, plastics and batteries, where recycling services are available.

  • 11.6. Recycled materials procured for use on site must be assessed to ensure they meet quality, contractual and legal requirements

  • 11.7. Materials for re-use, recycling or disposal must be segregated and located in areas that are clearly defined and well signed

  • 11.8. Spoil and inert waste to be reused offsite must be risk assessed and meet legal requirements prior to transportation

  • 11.9. Spoil and waste for disposal must be classified and transported by appropriately licensed contractors to licensed or approved facilities

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.