Information

  • Document No.

  • 1. Communities

  • 2. Contractor

  • 3. Project Manager / Supervisor

  • 4. Date

  • 5. Area of inspection

  • Assessor

  • Location
  • Personnel

GMR 1

GMR 1 FALL PREVENTION

  • 1.1 Physical barriers

  • Add media

  • 1.2 Harness if required for secondary restraint & competency assessed

  • Add media

  • 1.3 SWMS in place with adequate controls

  • Add media

  • 1.4 Rescue procedures in place

  • Add media

GMR 2

GMR 2 PERIMETER PROTECTION

  • 2.1 Physical barriers of sufficient height and strength erected where persons

  • Add media

GMR 3

GMR 3 FORMWORK

  • 3.1 Fabricated at ground level where possible

  • Add media

  • 3.2 Fall risks managed

  • Add media

  • 3.3 Installed to design

  • Add media

GMR 4

GMR 4 PENETRATIONS, RISERS AND SHAFTS

  • 4.1 Covers secured (screwed or bolted but not nailed) with warning signage

  • Add media

  • 4.2 When covers removed for work purposes secondary measures installed to reduce fall risk

  • Add media

GMR 5

GMR 5 SCAFFOLDS, TEMPORARY WORKS

  • 5.1 No mixing of components

  • Add media

  • 5.2 Inspection & tagging regime in place

  • Add media

  • 5.3 Calculations & drawings

  • Add media

  • 5.4 Erected, altered & dismantled by competent persons

  • Add media

  • 5.5 Free from defects

  • Add media

  • 5.6 Ladders extending 1M above egress

  • Add media

  • 5.7 Fall risks managed

  • Add media

  • 5.8 Boarded/planked out/<br>

  • Add media

  • 5.9 High risk temporary structures eg billboards/hoarding – design & certification paperwork maintained<br>

  • Add media

GMR 6

GMR 6 WORK PLATFORMS

  • 6.1 SWMSs in place with adequate controls

  • Add media

  • 6.2 Harnesses in use in boom type EWPs

  • Add media

  • 6.3 Anchor points must be engineered

  • Add media

  • 6.4 Competency records held

  • Add media

  • 6.5 Documented inspections completed

  • Add media

GMR 7

GMR 7 LADDERS

  • 7.1 Use minimised & safer methods selected where possible

  • Add media

  • 7.2 Step ladders only used for 15 mins or less

  • Add media

  • 7.3 Industrially rated (stickered) & minimum 120kg rating

  • Add media

  • 7.4 In good condition

  • Add media

  • 7.5 Secured to prevent movement

  • Add media

  • 7.6 Non-conductive ladders for electrical works

  • Add media

  • 7.7 Extending at least 1M above egress point

  • Add media

GMR 8

GMR 8 FALL OF MATERIALS

  • 8.1 Tethers, catch nets, exclusion zones in place

  • Add media

  • 8.2 Housekeeping to minimise materials which could fall

  • Add media

GMR 9

GMR 9 SITE ACCESS CONTROL

  • 9.1 Unauthorised persons prevented from entering & entry/exit records maintained<br> <br> <br> <br>

  • Add media

GMR 10

GMR 10 FENCING

  • 10.1 In place for all high risk activities & complete (no gaps where public could enter

  • Add media

  • 10.2 Erected to manufacturers requirements

  • Add media

  • 10.3 Documented inspections taking place

  • Add media

GMR 11

GMR 11 PUBLIC PROTECTION

  • 11.1 Protection of public from construction activities including works inside fenced perimeters & also traffic movements

  • Add media

  • 11.2 Road & access ways clean & free from material & waste

  • Add media

  • 11.3 Loads secured prior to exiting site

  • Add media

GMR 12

GMR 12 PEDESTRIAN AND VEHICLE SAFETY

  • 12.1 Separate entrances for pedestrians & vehicles

  • Add media

  • 12.2 Parking separation LV/HV with reverse parking

  • Add media

  • 12.3 Delivery procedures in place

  • Add media

  • 12.4 Vehicles choked/braked before unloading or leaving

  • Add media

  • 12.5 TMP’s in place

  • Add media

  • 12.6 Licensed drivers/operators

  • Add media

  • 12.7 No use of phones & safety devices (seatbelts, beacons etc in use)

  • Add media

GMR 13

GMR 13 TOOLS & EQUIPMENT

  • 13.1 Inspection, testing & preventative maintenance regimes in place

  • Add media

  • 13.2 In good condition

  • Add media

GMR 14

GMR 14 HOUSEKEEPING

  • 14.1 Clean & tidy

  • Add media

  • 14.2 Clear access maintained

  • Add media

  • 14.3 Materials stored/stacked correctly

  • Add media

  • 14.4 Hazardous substances stored in accordance with SDS & segregation requirements

  • Add media

  • 14.5 Combustibles away from flammable products

  • Add media

  • 14.6 Products labelled & spill kits available

  • Add media

  • 14.7 Sharp edges (nails/star pickets etc) managed (eg denailed/capped

  • Add media

  • 14.8 Signage (PC, PPE, No Smoking, traffic) in place

  • Add media

  • 14.9 Waste bins (including recycling) available & emptied when required

  • Add media

GMR 15

GMR 15 EXCAVATIONS

  • 15.1 Excavation permit in place

  • Add media

  • 15.2 Services located & marked up before works commence

  • Add media

  • 15.3 Inspections (documented) by a competent person

  • Add media

  • 15.4 Excavations benched, battered or shored

  • Add media

  • 15.5 Adjacent structures supported

  • Add media

  • 15.6 Materials/traffic routes away from zone of influence

  • Add media

  • 15.7 Barriers and signage installed

  • Add media

  • 15.8 Safe access via ramps, ladders, stairs

  • Add media

  • 15.9 Well ventilated & water ingress controlled

  • Add media

  • 15.10 Spoil out of zone of influence & stored safely

  • Add media

GMR 16

GMR 16 WORK AROUND WATER

  • 16.1 Life jackets being worn, rescue equipment available<br> <br> <br> <br>

  • Add media

GMR 17

GMR 17 SAFE USE OF PLANT

  • 17.1 • Ticketed operators

  • Add media

  • 17.2 • In good condition & pre-start completed

  • Add media

  • 17.3 • Risk assessment & SWMSs available

  • Add media

  • 17.4 ROPs, seatbelts, flashing beacon, audible devices

  • Add media

  • 17.5 Fall risks (hand rails) managed

  • Add media

  • 17.6 Exclusion zone in place

  • Add media

  • 17.7 • Maintained with records available

  • Add media

GMR 18

GMR 18 CRANES AND LIFTING EQUIPMENT

  • 18.1 Safety devices (eg load indicators/overload alarms

  • Add media

  • 18.2 Lifting gear inspected, in good condition & used for its intended use & contained in a register

  • Add media

  • 18.3 Competency records held

  • Add media

  • 18.4 Communication protocol established

  • Add media

  • 18.5 Safety hooks/tag lines in use

  • Add media

GMR 19

GMR 19 ELECTRICAL SAFETY

  • 19.1 RCD’s/ELCB fitted

  • Add media

  • 19.2 Cables do not create tripping hazard nor are subject to physical damage

  • Add media

  • 19.3 Tested & tagged with register maintained

  • Add media

  • 19.4 No live work except under certain conditions

  • Add media

  • 19.5 LOTO in place & carried out by competent person

  • Add media

  • 19.6 Adequate lighting with emergency back-up (where required

  • Add media

GMR 20

GMR 20 HAZARDOUS SUBSTANCES

  • 20.1 SDS available & in register – accessible to workers

  • Add media

  • 20.2 • Stored, used & disposed in accordance with SDS

  • Add media

  • 20.3 PPE as per

  • Add media

GMR 21

GMR 21 PERSONAL PROTECTIVE EQUIPMENT

  • 21.1 Hard hat, glasses, gloves, high vis & boots & sun protection (brims, longs, sunscreen)

  • Add media

  • 21.2 Additional PPE dependent on task

  • Add media

  • 21.3 Signage at site entrances & where additional risks exist

  • Add media

  • 21.4 Stock available for workers & visitors

  • Add media

GMR 22

GMR 22 CONFINED SPACES

  • 22.1 Signed & protected to prevent access

  • Add media

  • 22.2 Permit/SWMSs & competent persons

  • Add media

  • 22.3 Rescue procedures & equipment

  • Add media

  • 22.4 Watch installed 100% of time persons in CS

  • Add media

GMR 23

GMR 23 MANUAL HANDLING

  • 23.1 Tasks assessed & safe lifting techniques identified

  • Add media

  • 23.2 Lifting aids in place

  • Add media

GMR 24

GMR 24 LONE WORKING

  • 24.1 Avoided where possible & systems in place to manage risk if unavoidable<br> <br> <br> <br>

  • Add media

GMR 25

GMR 25 WELFARE

  • 25.1 Toilets, wash facilities, drinking water<br> <br> <br> <br>

  • Add media

GMR 26

GMR 26 FIRE SAFETY & EMERGENCIES

  • 26.1 Minimise accumulation of combustibles

  • Add media

  • 26.2 Flashback arrestors on oxy acet

  • Add media

  • 26.3 Smoking only in designated areas

  • Add media

  • 26.4 • Hot work under permit

  • Add media

  • 26.5 • Emergency equipment available, tested/tagged & unobstructed with inspection regime in place

  • Add media

  • 26.6 • Trained responders (fire, first aid, confined space etc)

  • Add media

  • 26.7 Muster points/routes identified

  • Add media

GMR 27

GMR 27 STORMWATER, SEDIMENT AND EROSION CONTROL

  • 27.1 Uncontrolled discharges prevented

  • Add media

  • 27.2 Controls installed as designed

  • Add media

GMR 28

GMR 28 AIR AND NOISE EMISSIONS

  • 28.1 Dust suppression<br>

  • Add media

  • 28.2 Air and noise impacts assessed and controlled

  • Add media

GMR 29

GMR 29 SOILS & GROUNDWATER

  • 29.1 Contamination sources identified & segregated with controls identified to allow works to proceed<br> <br> <br> <br>

  • Add media

GMR 30

GMR 30 BIODIVERSITY, HERITAGE & ARTEFACTS

  • 30.1 Designated zones identified, signed & segregated with controls identified for works

  • Add media

  • 30.2 Work ceased where items discovered to allow for determination

  • Add media

GMR 31

GMR 31 WASTE MANAGEMENT

  • 31.1 Waste segregated for recycling & stored to prevent unauthorised access/uncontrolled release

  • Add media

  • 31.2 Excavated material reused on site where possible

  • Add media

  • 31.3 Service of plant & equipment offsite where possible

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.