Title Page
-
Conducted on
-
Prepared by
-
Plant/plants supplying concrete:
-
Contractor
-
Homeowner
-
Address
-
Mix design:
-
What is being poured?
-
Yardage of pour
Weather
-
Has it rained recently
-
Is it windy
-
Humidity?
-
Air temperature
Contractor practices
-
What were the grade conditions?
- Dry
- Muddy
- Soft
- Frozen
- Underwater
- Dampened
-
Did they cure?
-
Did they bless the slab?
-
Did they use steel trowel?
-
Is concrete protected from freezing?
-
Did they use misting?
-
Did they use an evaporation retardant?
-
Are there wind breaks?
-
What was the slump being placed?
Testing on site
-
Name of technician:
-
Testing firm:
-
What tests were being performed?
- Air
- Unit weight
- Slump
- Temperature
- Beams
- Cylinders
-
Were cylinders on site from a previous pour?
-
How were test cylinders/beams transferred?
Service
-
How many trucks were hauling to job?
-
Amount of trucks were:
-
Any cold joint issues?
-
Any delays causing timed out trucks?
-
Was any out of spec concrete used in pour?
-
If yes explain:
Notes
-
Notes: