Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General site conditions
-
Is the site secure?
-
Are the works areas clear of slip trip falls, debris.<br><br>
-
Is house keeping good, clean and tidy.
Equipment
-
Equipment on site have operational back-up alarms.
-
All mirrors on equipment operational.
-
Operators walking around equipment and looking under before operating.
-
Tracks or tires in good work order and adjusted correctly.
-
Seat belts being worn while operating.
-
Equipment checklist being performed daily.
-
Keys removed if not in use and equipment locked.
-
Equipment being used is in sound condition and fit for purpose.
-
Unsafe actions.
Excavations
-
Excavations protected from the public or other workers on-site.
-
Excavations deeper than 3 feet that require workers to be in them, have been reviewed by a competent person and a benching, sloping, shoring, or shielding plan have been put in place.
-
Spoil are more than 2 feet from the edge of the excavation.
-
Workers are not working above an excavation where equipment could fall on a worker in the bottom of an excavation.
-
Unsafe actions.
Emergency arrangements
-
Workers have a first-aid kit on site.
-
Workers are aware of the closet emergency room facility.
-
Workers know the number to call for emergency response personnel and know the directions to the site.
Management procedures.
-
JSA and tool box talks have been completed for workers on site.
-
Workers understand the scope of work.
-
Workers are capable to perform the specific scope of work in a safe manner.
Environmental
-
Spill kits is on site.
Personal Protective Equipment
-
All workers on site were wearing Head Protection, in good order.
-
Operatives were observed wearing hearing protection if needed.
-
Safety goggles or glasses were being worn for the correct operation.
-
Gloves fit for the task were worn. <br>
Overhead & Underground Services
-
Overhead & underground services/hazards have been identified and discussed with workers on site.
-
OKIE811 has been called and locates are up to date.
-
OKIE #:
Traffic Management
-
Traffic management plan is in place and being followed
Signatures.
-
Signed by site supervisor
-
Received by lead operator
-
Time and date of inspection
-
Remedial action to be completed by
-
Add drawing