UPRN & ADDRESS

    Site conducted
  • Conducted on

  • Prepared by

  • Location
  • Contractor Team

  • Housing Officer / Property Management Officer Present

PROPERTY INFORMATION

  • Project Tenure

  • Property Type

  • Property Age

  • Property Position

  • Number of Storeys (Ground and Above)

  • Lower Ground Floor

  • Is The Roof A Habitable Space?

  • What Is The Construction Type?

  • Is There Evidence Of CWI Being Installed?

  • Is It A Listed Building?

  • Is It In A Conservation Area?

  • Does It Require A Design Scaffold?

  • Is A Scaffold Alarm Required?

  • Explain Why An Alarm Is Not Required

  • Is There Any Third Party Licensing Required To Erect The Scaffold? For Example: TFL, National Rail etc

  • Confirm What Third Parties Need To Be Notified About The Project

MAIN ROOF / ROOF WINDOWS AND CHIMNEYS

  • Main Roof Structure

  • Existing Roof Covering

  • Existing Roof Covering

  • Existing Roof Finish - Main Roof

  • Age of Roof Covering

  • Condition of Existing Roof

  • Main Roof - Work Required

  • Loft Insulation

  • Skylight Windows

  • Confirm Number of Skylights To Be Renewed and Materials etc

  • Chimneys

  • Please Provide Further Details

  • OVERALL ROOF CONDITION

FRONT ELEVATION - ADDITIONAL ROOF STRUCTURES AND RAINWATER GOODS

  • Gutters

  • Downpipes

  • Fascias

  • Soffits

  • Bargeboards

  • Are There Any Additional Roof Structures or Balconies Located On The Front Facade?

  • Choose The Relevant Structures And Use Notes To Detail The Proposed Remedial Works

FRONT ELEVATION - WINDOWS AND DOORS

  • Dwellings - Existing Window Material

  • Dwellings - Existing Window Type

  • Dwellings - Existing Glazing Type

  • Dwellings - Age of Existing Windows

  • Dwellings - Condition of Existing Windows

  • Renew Windows - Specify Proposed Type and Material

  • Describe What Works Are Required To These Windows

  • If Repairing The Existing Windows To The Dwellings, Do You Recommend Draughtproofing?

  • Are There Communal Windows?

  • Existing Window Material

  • Existing Window Type

  • Existing Glazing Type

  • Age of Communal Windows

  • Condition of Communal Windows

  • Renew Communal Windows - Specify Proposed Type and Material

  • Can The Communal Windows Be Satisfactorily Repaired Rather Than Renewed?

  • Describe What Works Are Required To These Windows

  • OVERALL RATING - ALL FRONT WINDOWS

  • Is There A Communal Main Entrance Door?

  • Existing MED Material

  • Existing MED Condition

  • Renew MED - Specify Proposed Type and Material

  • Can The MED Be Satisfactorily Repaired Rather Than Renewed?

  • Describe What Works Are Required To The MED

  • Are There Any External Front Entrance Doors To Individual Properties (Which Can Be Entered From The Street)

  • Existing External FED Material

  • Age of External Front Entrance Door

  • Condition of External Front Entrance Doors

  • If FED Renewal Is Proposed Please Specify Proposed Material and Type

  • Can The FEDs Be Satisfactorily Repaired Rather Than Renewed?

  • Additional External FEDs - Is There More Than 1No External FED?

  • How Many?

  • Door Material?

  • Location of Doors? i.e Which Flats They Relate To.

  • Works Required

  • OVERALL RATING - EXTERNAL MAIN AND FRONT ENTRANCE DOORS

FRONT FACADE

  • Facade Type

  • Front Facade - Works Required; Select As Many As Required And Use Notes To Indicate Locations and Quantities

  • Front Facade Redecoration To All Previously Painted Surfaces - Specify Paint Type

  • Front Facade Redecoration To All Previously Painted Timber Surfaces - Specify Paint Type

  • Front Facade Redecoration To All Previously Painted Surfaces - Specify Paint Type

  • Front Facade Redecoration To All Previously Painted Timber Surfaces - Specify Paint Type

  • Are Anti-Pigeon Works Needed?

  • Choose The Deterrent

  • OVERALL RATING - FRONT FACADE

REAR ELEVATION - ADDITIONAL ROOF STRUCTURES AND RAINWATER GOODS

  • Gutters

  • Downpipes

  • Soil Vent Pipe

  • Fascias

  • Soffits

  • Bargeboards

  • Are There Any Additional Roof Structures To The Rear?

  • Roof Type

  • Roof Covering

  • Age of Roof Covering

  • Condition of Roof

  • Specify The Works Required

  • Loft Insulation

  • Is The Roof Suitable For A Thermal Upgrade?

  • Are Any Additional Works Required For The Secondary Roof? Please Choose

  • OVERALL RATING - REAR SECONDARY ROOF

REAR ELEVATION - WINDOWS AND DOORS

  • Dwellings - Existing Window Material

  • Dwellings - Existing Window Type

  • Dwellings - Existing Glazing Type

  • Dwellings - Age of Windows

  • Dwellings - Condition of Rear Windows

  • Renew Windows, Specify Proposed Type and Material

  • Carry Out Major Repairs (Not Renewal)

  • Do You Recommend Draughtproofing?

  • Describe What Works Are Required To The Windows

  • If Repairing The Windows, Do You Recommend Draughtproofing?

  • Are There Communal Windows

  • Existing Window Material

  • Existing Window Type

  • Existing Glazing Type

  • Age of Communal Windows

  • Condition of Communal Windows

  • Renew Windows, Specify Proposed Type and Material

  • Carry Out Major Repairs (Not Renewal)

  • Do You Recommend Draughtproofing?

  • OVERALL RATING - ALL REAR WINDOWS

  • Is There A Communal Rear Entrance Door?

  • Existing Material

  • Existing Condition

  • Renew RED - Specify Proposed Type and Material

  • Can The Door Be Satisfactorily Repaired Rather Than Renewed?

  • Describe The Works Required To The RED

  • Are There Any Rear Entrance Doors To Specific Dwellings?

  • Existing Material

  • Age of Dwelling Specific REDs

  • Condition of Rear Entrance Doors (Dwelling Specific)

  • Renew Rear Entrance Door (Dwelling Specific) - Specify Proposed Type and Material

  • Can The Door Be Satisfactorily Repaired Rather Than Renewed?

  • Describe What Works Are Required To The Individual REDs

  • Additional External REDs? Is There More Than 1No External RED

  • How Many?

  • Door Material?

  • Location of Doors? i.e Which Flats They Relate To.

  • Works Required

  • OVERALL RATING - ALL EXTERNAL REAR ENTRANCE DOORS

REAR FACADE

  • Facade Type

  • Rear Facade - Works Required; Select As Many As Required And Use Notes To Indicate Locations And Quantities

  • Front Facade Redecoration To All Previously Painted Surfaces - Specify Paint Type

  • Rear Facade Redecoration To All Previously Painted Timber Surfaces - Specify Paint Type

  • Rear Facade Redecoration To All Previously Painted Surfaces - Specify Paint Type

  • Rear Facade Redecoration To All Previously Painted Timber Surfaces - Specify Paint Type

  • Are Anti-Pigeon Works Needed?

  • Choose The Deterent

  • OVERALL RATING - REAR FACADE

OTHER FACADES (LEFT AND RIGHT)

  • Does The Building Have a Left Hand Facade?

  • Please Provide Details of This Facade / Number and Type of Windows etc

  • Does The Building Have Right Hand Facade?

  • Please Provide Details of This Facade / Number and Type of Windows etc

BUILDING CONTROL, PLANNING AND LISTED BUILDING CONSENT

  • Are Any Of The Works Identified Not Self-Certifiable And Will Building Control Approval Be Required (For Example Proposed Structural Works, Replacement Communal Windows or Works To An HRB?

  • Window Renewal - Is Planning Permission Required

  • Additional Information For Planning Permission

  • Additional Information For Planning Permission

  • Additional Information for Planning Permission

  • Additional Information For Planning Permission

  • Roof Renewal - Is Planning Permission Required

  • Additional Information for Planning Permission

  • Confirm The Roof Replacement Will Be Like For Like

  • Is Listed Building Consent Required?

  • Please Clearly Detail The Works Requiring Listed Building Consent

  • Local Authority

INTERNAL COMMUNAL AREAS

  • Is There An Internal Communal Area?

  • Were You Able To Access The Communal Area?

  • How Many Communal Areas Does The Block Have?

  • What Are The Approximate Sizes of The Internal Communal Area

  • Preparation of Walls: Select As Many As Required And Use Notes To Indicate Locations And Quantities

  • Redecoration of Walls; Specify Paint Type

  • Preparation of Ceilings: Select As Many As Required And Use Notes To Indicate Locations and Quantities

  • Redecoration of Ceilings; Specify Paint Type

  • Redecoration of Metal Surfaces; Specify Paint Type

  • Redecoration of Timber Surfaces; Specify Paint Type

  • How Many Internal FEDs Does The Block Have?

  • Existing Internal FED Materials

  • Internal FED - Works Required

  • Arrange Revisit or Estimate Using PSUMs

  • How Many Internal Communal Doors Are In The Communal Area

  • Works Required To Internal Communal Doors

  • Are There Intake Cupboard Doors Present In The Communal Area

  • How Many?

  • Works Required To Intake Cupboard Doors

  • Communal Flooring; Select As Many As Required and Use 'Notes' To Indicate Locations and Quantities

  • Stair Nosings; Select As Many As Required and Use 'Notes' to Indicate Locations and Quantities

  • OVERALL RATING - INTERNAL COMMUNAL DECORATIONS

  • For Blocks With More Than 1No Communal Area Do They Have The Same Overall Rating?

  • Please Confirm What Rating You Would Apply To The Other Internal Communal Areas

  • Internal Signage

COMMUNAL ELECTRICAL WORKS

  • Are Any Electrical Works Required?

  • Choose Required Electrical Works

EXTERNAL AREAS (NON-BUILDING)

  • Are Any Works Required To Main Steps and Landings - Finishes

  • Choose Remedial Work And Use Notes To Indicate Locations And Quantities

  • Are Any Works Required To In-Situ Concrete Roads, Pavings & Steps

  • Choose Remedial Work And Use Notes To Indicate Locations And Quantities

  • Are Any Works Required To Slab Paving & Steps

  • Choose Remedial Work And Use Notes To Indicate Locations And Quantities

  • Are Any Works Required To Block Paving

  • Choose Remedial Work And Use Notes To Indicate Locations And Quantities

  • Are Any Asphalting Works Required

  • Pedestrian Paving - Choose Remedial Work And Use Notes To Indicate Locations And Quantities

  • Roads and Car Parks - Choose Remedial Work And Use Notes To Indicate Locations And Quantities

  • Are Any Works Required To Resin Bound Paving

  • Choose Remedial Work And Use Notes To Indicate Locations And Quantities

  • Is Any Car Park Marking Required

  • Choose Works And Use Notes To Indicate Locations And Quantities

  • Are Any Works Required To Trees and Landscaping

  • Choose Works And Use Notes To Indicate Locations And Quantities

  • Are The Trees Protected By A Preservation Order

  • Are Any Works Required To Boundary Fencing - TIMBER

  • Choose Works And Use Notes To Indicate Fencing Type, Locations And Quantities

  • Are Any Works Required To Boundary Railings - METAL

  • Choose Works And Use Notes To Indicate Railing Type, Locations And Quantities

  • Are Any Works Required To Main Gates - TIMBER or METAL

  • Choose Works And Use Notes To Indicate Locations And Quantities

  • Please Confirm How Many Additional Gates Are On Site

  • Specify Type and Material of Additional Gates - Provide Detail in Notes

  • Are Any Works Required To Handrails

  • Choose Works And Use Notes To Indicate Locations

  • Are Any Works Required To Boundary Walls

  • Choose Works And Use Notes To Indicate Locations And Quantities

  • Are Any Drainage Works Required

  • Choose Works And Use Notes To Indicate Locations And Quantities

  • OVERALL CONDITION - EXTERNAL AREA (NON-BUILDING)

  • Confirm Which Works Are Essential For H&S Reasons and Details Reasons In Notes

ENERGY EFFICIENCY

  • Current EPC Rating Of Each Property

  • Is There Evidence Of Mechanical Ventilation To Each Dwelling

  • Is There Evidence of Passive Ventilation To Each Dwelling

SURVEYS, TESTING AND REPORTS

  • R&D Asbestos Survey Required

  • Drainage CCTV Required

  • Electrical Installation and Condition Report and Test Required

  • Cavity Wall Survey Required

  • Energy Performance Certificate Required (Per Dwelling)

  • Airtightness Test (Per Dwelling)

  • Planning Application Required

  • Confirm Number of Dwellings

  • Is A Party Wall Agreement Required

  • Confirm Details of Properties With Which A Party Wall Agreement Is Required

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.